| Engineer | Form: (02) 400396763 04/11/2013 | 1)Provide notice of MIRU via an electronic Form 42.
2)Comply with Rule 317.i and provide cement coverage to a minimum of 200' above the Niobrara. Verify cement coverage with a cement bond log per 317.o.
|
| Permit | Form: (02) 400396763 04/16/2013 | Operator must meet Water Well Testing requirements as per amended Rule 318Ae(4)
|