Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-37329
Well Classification: OW Status: SI - 6/1/2023
Well Name/No:Alm #33V-404
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date6/1/2023
FacilityID:432869LocationID:432871
County:WELD #123Location:NENE 33 7N65W 6
Field:WATTENBERG - #90750Elevation:4791 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1173FNL  330 FELLat/Long: 40.534740 / -104.660020Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.534742 / -104.660014Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 6/21/2015
End Date: 6/22/2015
Reported: 7/28/2016
Days to report: 402
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: SI - 6/1/2023             Measured TD: 11565 ft.    Vertical TD: 7126 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        SI - 6/1/2023
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:5/15/2015
Proposed Top PZ Location:Sec:33 Twp: 7N 65W Footage: 1397 FNL  734 FEL
Bottom Hole Location:Sec:33 Twp: 7N 65W Footage: 1413 FNL  500 FWL
Proposed Depth/Form:11524 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: 320, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 875 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 830, Top: 0 ft., Bottom: 875 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7685 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 650, Top: 0 ft., Bottom: 7685 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6383 ft., Depth: 11524 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:4/8/2015
Spud Date:3/30/2015Spud Date Is:ACTUAL
Measured TD:11565 ft.Measured PB depth:11558 ft.
True Vertical TD:7126 ft.True Vertical PB depth:7126 ft.
Top PZ Location:Sec:33 Twp: 7N 65WFootage: 1409 FNL  761 FEL
Bottom Hole Location:Sec:33 Twp: 7N 65WFootage: 1434 FNL  500 FWL
Log Types:CBL, MWD (DIL in 123-23733)
Casing:String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 928 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 900, Top: 0 ft., Bottom: 928 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7541 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 785, Top: 0 ft., Bottom: 7541 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 7196 ft., Depth: 11561 ft., Weight: 13.5 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
PARKMAN3747 ft.
SUSSEX4527 ft.
SHANNON5177 ft.
SHARON SPRINGS6645 ft.
NIOBRARA6864 ft.
FORT HAYS7344 ft.
CODELL7452 ft.

Formation FTHYS                   Formation Classification:  OW                   Status:  CM - 9/26/2016                 Interval Top: 9213 ft.    Interval Bottom: 11184 ft.

 Completed Information for Formation FORT HAYS
1st Production Date:N/AChoke Size: 
Formation Name:FORT HAYSCommingled:Yes
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:
Treatment Date:9/26/2016Treatment End Date:N/A
Treatment Summary:Completed Depths: 9213-9317, 9539-9668, 10206-11184
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FTHYS.
Perforation Data:
Interval Top:9213 ft.# Of Holes:
Interval Bottom:11184 ft.Hole Size:

Formation CD-FH                   Formation Classification:  OW                   Status:  SI - 6/1/2023                  Interval Top: 7607 ft.    Interval Bottom: 11565 ft.

 Completed Information for Formation CODELL-FORT HAYS
1st Production Date:7/4/2015Choke Size: 
Formation Name:CODELL-FORT HAYSCommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:6/21/2015Treatment End Date:6/22/2015
Treatment Summary:20 Stage Sliding Sleeve Total Fluid: 78,926 bbls Gel Fluid: 59,539 bbls Slickwater Fluid: 19,387 bbls Total Proppant: 4,494,400 lbs Silica Proppant: 4,494,400 lbs Method for determining flowback: measuring flowback tank volumes
Total fluid used in treatment (bbls):78926Max pressure during treatment (psi):4138
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:20
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.98
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):2640
Fresh water used in treatment (bbls):78926Disposition method For flowback:DISPOSAL
Total proppant used (lbs):4494400Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7163 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/12/2015Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 501
BBLS_OIL 162
BTU_GAS 1265
CALC_BBLS_H2O 501
CALC_BBLS_OIL 162
CALC_GOR 1234
CALC_MCF_GAS 200
CASING_PRESS 1579
GRAVITY_OIL 50
MCF_GAS 200
TUBING_PRESS 906
Perforation Data:
Interval Top:7607 ft.# Of Holes:
Interval Bottom:11565 ft.Hole Size:

Formation CODL                     Formation Classification:  OW                     Status:  CM - 9/26/2016                 Interval Top: 7607 ft.    Interval Bottom: 11565 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:
Treatment Date:9/26/2016Treatment End Date:N/A
Treatment Summary:Completed Depths: 7607-9213, 9317-9539, 9668-10206, 11184-11565
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7607 ft.# Of Holes:
Interval Bottom:11565 ft.Hole Size:
Primary Well Designation:
Noticed Inactive      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveYNoticed Date
09/30/2024
Defined Inactive (SI )YDefined Inactive
05/31/2023
Low ProducingYProduction Period
10/2024 - 09/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No