| Permit | Form: (02) 400367210 01/18/2013 | Operator must meet water well testing requirements per Rule 318A.
|
| Engineer | Form: (02) 400367210 01/28/2013 | 1) Note surface casing setting depth change from 400’ to 840’. Increase cement coverage accordingly.
2) Submit Form 42 electronically to COGCC 48 hours prior to MIRU.
3) Comply with Rule 317.i and provide cement coverage from TD to a minimum of 200' above Niobrara. Verify coverage with cement bond log.
4) Run and submit Directional Survey from TD to base of surface casing. The operator shall comply with Rule 321, and it shall be the operator’s responsibility to ensure that the wellbore complies with setback requirements in commission orders or rules prior to producing the well.
|