Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-36823
Well Classification: OW Status: SI - 1/1/2023
Well Name/No:Breakneck Properties #21-6
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date1/1/2023
FacilityID:431858LocationID:431859
County:WELD #123Location:NWNE 6 3N68W 6
Field:WATTENBERG - #90750Elevation:5082 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:469FNL  2026 FELLat/Long: 40.260690 / -105.043860Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.260695 / -105.043855Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 7/29/2013
End Date: 7/30/2013
Reported: 9/26/2013
Days to report: 58
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 1/1/2023             Measured TD: 8010 ft.    Vertical TD: 7855 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 1/1/2023
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:2/18/2015
Proposed Top PZ Location:Sec:6 Twp: 3N 68W Footage: 574 FNL  1962 FWL
Bottom Hole Location:Sec:6 Twp: 3N 68W Footage: 565 FNL  1924 FWL
Proposed Depth/Form:7840 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: N/2NW/4
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232-23 , Unit Acreage: 320, Drill Unit: N/2
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 80, Drill Unit: N/2NW/4
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 840 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 180, Top: 0 ft., Bottom: 840 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7840 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 190, Top: 6705 ft., Bottom: 7840 ft.

Wellbore Completed
Completion Date:4/29/2013
Spud Date:4/24/2013Spud Date Is:ACTUAL
Measured TD:8010 ft.Measured PB depth:7954 ft.
True Vertical TD:7855 ft.True Vertical PB depth:7799 ft.
Top PZ Location:Sec:6 Twp: 3N 68WFootage: 574 FNL  1962 FWL
Bottom Hole Location:Sec:6 Twp: 3N 68WFootage: 565 FNL  1924 FWL
Log Types:CBL, GammaRay, Induction
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 881 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 365, Top: 0 ft., Bottom: 881 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7996 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 710, Top: 1340 ft., Bottom: 7996 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX3942 ft.
NIOBRARA7052 ft.
CODELL7350 ft.
J SAND7834 ft.

Formation JSND                     Formation Classification:  OW                     Status:  SI - 1/1/2023                  Interval Top: 7834 ft.    Interval Bottom: 7860 ft.

 Completed Information for Formation J SAND
1st Production Date:8/8/2013Choke Size: 
Formation Name:J SANDCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:7/26/2013Treatment End Date:N/A
Treatment Summary:Frac J Sand with 250,380# 30/50 and 113,162 gals SLF
Total fluid used in treatment (bbls):2694Max pressure during treatment (psi):5481
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.92
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):1370
Fresh water used in treatment (bbls):Disposition method For flowback:DISPOSAL
Total proppant used (lbs):250380Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:7834 ft.# Of Holes:63
Interval Bottom:7860 ft.Hole Size:0.42 in.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 1/30/2014                 Interval Top: 7351 ft.    Interval Bottom: 7375 ft.

 Completed Information for Formation CODELL
1st Production Date:8/8/2013Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:7/29/2013Treatment End Date:7/30/2013
Treatment Summary:Set CFP @ 7425', perforate Codell Frac Codell with 250,340# 30/50 and 91,726 gals SLF
Total fluid used in treatment (bbls):2184Max pressure during treatment (psi):4772
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.84
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):1370
Fresh water used in treatment (bbls):Disposition method For flowback:DISPOSAL
Total proppant used (lbs):250340Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7351 ft.# Of Holes:72
Interval Bottom:7375 ft.Hole Size:0.42 in.

Formation JNBCD                   Formation Classification:  OW                   Status:  CM - 8/22/2013                 Interval Top: 7056 ft.    Interval Bottom: 7860 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:8/8/2013Choke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/22/2013Treatment End Date:N/A
Treatment Summary:Set CBP (Kill Plug @ 6,990' - 66' above NBRR perfs). 08-01-2013
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7814 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/22/2013Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 118
BBLS_OIL 121
BTU_GAS 1270
CALC_BBLS_H2O 118
CALC_BBLS_OIL 121
CALC_GOR 1578
CALC_MCF_GAS 191
CASING_PRESS 1695
GRAVITY_OIL 44
MCF_GAS 191
TUBING_PRESS 606
Perforation Data:
Interval Top:7056 ft.# Of Holes:235
Interval Bottom:7860 ft.Hole Size:0.42 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  SI - 1/1/2023                  Interval Top: 7056 ft.    Interval Bottom: 7375 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:8/8/2013Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:7056 ft.# Of Holes:172
Interval Bottom:7375 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 1/30/2014                 Interval Top: 7056 ft.    Interval Bottom: 7149 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:8/8/2013Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:7/30/2013Treatment End Date:7/30/2013
Treatment Summary:Set CFP @ 7204' and perforate Niobrara Frac Niobrara with 250,100# 30/50 and 92,900 gals SLF
Total fluid used in treatment (bbls):2212Max pressure during treatment (psi):5417
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.85
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):1370
Fresh water used in treatment (bbls):Disposition method For flowback:DISPOSAL
Total proppant used (lbs):250100Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:7056 ft.# Of Holes:100
Interval Bottom:7149 ft.Hole Size:0.42 in.
Primary Well Designation:
Out Of Service      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2027
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (SI )YDefined Inactive
12/31/2022
Low ProducingYProduction Period
12/2024 - 11/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No