Engineer | Form: (02 ) 400344088 12/18/2012 | 1) Submit Form 42 electronically to COGCC 48 hours prior to MIRU.
2) Comply with Rule 317.i and provide cement coverage from end of 7” casing to a minimum of 200' above Niobrara. Verify coverage with cement bond log.
3) Comply with Rule 321. Run and submit Directional Survey from TD to base of surface casing. Ensure that the wellbore complies with setback requirements in commission orders or rules prior to producing the well.
|
Engineer | Form: (04 ) 400789314 4/10/2015 | Operator acknowledges the proximity of the listed wells. Operator agrees to provide mitigation Option 1 or 2 (per the DJ Basin Horizontal Offset Policy), ensure all applicable documentation is submitted , and submit a Form 42(s) (“OFFSET MITIGATION COMPLETED”) for the remediated wells, referencing the API Number of the proposed horizontal well(s) stating what appropriate mitigation occurred and that it has been completed, prior to the hydraulic stimulation of this well.
VC LeClerg Gas Unit #1 (API 123-08392) |
Engineer | Form: (04 ) 400928992 11/4/2015 | Use of oil-based mud approved only for drilling below cemented surface casing. |
Engineer | Form: (04 ) 403857738 7/24/2024 | 1) Provide electronic Form 42-Other ("Treatment") two business days ahead of operations.
2) During treatment operations, the operator will continuously monitor the surface and casing pressures of the wellbore being treated. If there is any reason to suspect a potential downhole failure during treatment operations, stop treatment and contact ECMC engineering.
3) The Operator will submit the Form 5A, Completed Interval Report within 30 days after the treatment operations
|