|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 10/1/2024 Measured TD: 14445 ft. Vertical TD: 7124 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 10/1/2024 | Wellbore Permit | HORIZONTAL | Permit #: | | Expiration Date: | 12/27/2014 | Proposed Top PZ Location: | Sec:22 Twp: 3N 68W | Footage: 2441 FNL 670 FEL | Bottom Hole Location: | Sec:21 Twp: 3N 68W | Footage: 2462 FNL 2156 FEL | Proposed Depth/Form: | 14522 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 480, Drill Unit: GWA | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: 480, Drill Unit: GWA | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 906 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 344, Top: 0 ft., Bottom: 906 ft. | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7620 ft., Weight: 26 , Citings Type: PLANNED | Cement: | Sacks: 830, Top: 0 ft., Bottom: 7620 ft. | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6620 ft., Depth: 14421 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 540, Top: 6720 ft., Bottom: 14421 ft. |
| | |
Wellbore Completed | Completion Date: | 11/28/2015 | Spud Date: | 1/6/2014 | Spud Date Is: | ACTUAL | Measured TD: | 14445 ft. | Measured PB depth: | 14391 ft. | True Vertical TD: | 7124 ft. | True Vertical PB depth: | 7124 ft. | Top PZ Location: | Sec:22 Twp: 3N 68W | Footage: 2441 FNL 670 FEL | Bottom Hole Location: | Sec:21 Twp: 3N 68W | Footage: 2462 FNL 2156 FEL | Log Types: | | Log Types: | MWD with GR, CBL, CCL | Log Types: | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 920 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 344, Top: 0 ft., Bottom: 920 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 7685 ft., Weight: 26 , Citings Type: ACTUAL | Cement: | Sacks: 690, Top: 42 ft., Bottom: 7685 ft., Determination Method: CBL | Casing: | String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 14438 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 905, Top: 0 ft., Bottom: 14438 ft., Determination Method: VISU | Casing: | String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6616 ft., Depth: 14438 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 490, Top: 6616 ft., Bottom: 14438 ft., Determination Method: CBL | Additional Cement: | String Type: 2ND , Top: 0 ft., Depth: 6516 ft., Bottom: 6516 ft., Sacks: 415, Method: DV TOOL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4526 ft. | | | | SHARON SPRINGS | 7141 ft. | | | | NIOBRARA | 7237 ft. | | | |
Formation NBRR Formation Classification: OW Status: PR - 10/1/2024 Interval Top: 7693 ft. Interval Bottom: 14383 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 8/8/2016 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 7/21/2016 | Treatment End Date: | 7/28/2016 | Treatment Summary: | "PERF AND FRAC FROM 7693-14,383.
48 BBL 7.5% HCL ACID, 5,868 BBL PUMP DOWN, 181,494 BBL SLICKWATER, 187,410 BBL TOTAL FLUID
848,476# 100 MESH UNSPECIFIED, 4,650,843# 40/70 PREMIUM, - 5,499,319# TOTAL SAND."
| Total fluid used in treatment (bbls): | 187410 | Max pressure during treatment (psi): | 7473 | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.30 | Type Of gas: | | Number Of staged intervals: | 33 | Total acid used in treatment (bbls): | 48 | Min frac gradient (psi/ft): | 0.84 | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 2051 | Fresh water used in treatment (bbls): | 187362 | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 5499319 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 8/9/2016 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 513 | BBLS_OIL | 114 | BTU_GAS | 1367 | CALC_BBLS_H2O | 513 | CALC_BBLS_OIL | 114 | CALC_GOR | 1500 | CALC_MCF_GAS | 171 | CASING_PRESS | 992 | GRAVITY_OIL | 48 | MCF_GAS | 171 |
| Perforation Data: | Interval Top: | 7693 ft. | # Of Holes: | 594 | Interval Bottom: | 14383 ft. | Hole Size: | 0.46 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 5171 |
Total Gas Produced (MCF) | 43822 |
GOR | 8474 |
GOR Determination | BOE |
Average BOE per Day | 35.088 |
Average MCFE per Day | 203.522 |
Federal Financial Assurance | i | |
|
|