| Permit | Form: (02) 400078566 05/07/2012 | Operator must meet water well sampling requirements as per Rule 318A. |
| Engineer | Form: (02) 400078566 05/14/2012 | 1)Provide 48 hour notice of MIRU via an electronic Form 42.
2)Comply with Rule 317.i and provide cement coverage from the end of the production casing to a minimum of 200' above the Niobrara. Verify coverage with a cement bond log.
3)Comply with Rule 321. Run and submit Directional Survey from the TD to surface. Ensure that the wellbore complies with setback requirements in commission orders or rules prior to producing the well.
|
| Engineer | Form: (04) 402561890 07/13/2021 | This approval is good for one year and a new application must be made before 2/24/2022. Updates for the planned utilization of the well should be included with the application. |
| Engineer | Form: (04) 402923093 02/01/2022 | This approval is good for one year and a new application must be made before 1/12/2023. Updates for the planned utilization of the well should be included with the application.
|