Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-35676
Well Classification: OW Status: TA - 2/6/2020
Well Name/No:North Platte #42-34
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:BONANZA CREEK ENERGY OPERATING COMPANY LLC - 8960
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:TAStatus Date2/6/2020
FacilityID:429081LocationID:413974
County:WELD #123Location:NENE 34 5N63W 6
Field:WATTENBERG - #90750Elevation:4534 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:685FNL  668 FELLat/Long: 40.361290 / -104.415070Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.361290 / -104.415070Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 7/16/2012
End Date: 7/16/2012
Reported: 10/9/2012
Days to report: 85
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: TA - 2/6/2020             Measured TD: 6844 ft.    Vertical TD: 6659 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        TA - 2/6/2020
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:5/30/2014
Proposed Top PZ Location:Sec:34 Twp: 5n 63w Footage: 1984 FNL  662 FEL
Bottom Hole Location:Sec:34 Twp: 5n 63w Footage: 1986 FNL  658 FEL
Proposed Depth/Form:6812 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: DKTA , Formation: DAKOTA , Order: , Unit Acreage: 40, Drill Unit: SENE
Formation And Spacing:Code: JSND , Formation: J SAND , Order: , Unit Acreage: 320, Drill Unit: E/2
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: , Unit Acreage: 40, Drill Unit: SENE
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 410 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 170, Top: 0 ft., Bottom: 410 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6812 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 154, Top: 6768 ft., Bottom: 6812 ft.

Wellbore Completed
Completion Date:6/25/2012
Spud Date:6/21/2012Spud Date Is:ACTUAL
Measured TD:6844 ft.Measured PB depth:6833 ft.
True Vertical TD:6659 ft.True Vertical PB depth:6648 ft.
Top PZ Location:Sec:34 Twp: 5n 63wFootage: 1984 FNL  662 FEL
Bottom Hole Location:Sec:34 Twp: 5n 63wFootage: 1986 FNL  658 FEL
Log Types:CBL, GAMMA RAY, HRI, CDL, CNL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 475 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 380, Top: 0 ft., Bottom: 475 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6833 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 475, Top: 2375 ft., Bottom: 6844 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SHARON SPRINGS6284 ft.
NIOBRARA6402 ft.
CODELL6658 ft.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 2/6/2020                  Interval Top: 6658 ft.    Interval Bottom: 6668 ft.

 Completed Information for Formation CODELL
1st Production Date:7/20/2012Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:7/16/2012Treatment End Date:7/16/2012
Treatment Summary:Pumped 3336 bbls of pHaserFrac fluid, 12 bbl 15% HCL, 245600 lbs 20/40 sand
Total fluid used in treatment (bbls):3336Max pressure during treatment (psi):3396
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):12Min frac gradient (psi/ft):0.92
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):1186
Fresh water used in treatment (bbls):3324Disposition method For flowback:DISPOSAL
Total proppant used (lbs):245600Green completions techniques utilized:No
Reason green techniques Not utilized: PIPELINE
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:6658 ft.# Of Holes:40
Interval Bottom:6668 ft.Hole Size:0.4 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  TA - 2/6/2020                  Interval Top: 6408 ft.    Interval Bottom: 6668 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:7/20/2012Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 13
BBLS_OIL 49
BTU_GAS 1311
CALC_BBLS_H2O 4
CALC_BBLS_OIL 16
CALC_GOR 4795
CALC_MCF_GAS 78
CASING_PRESS 395
GRAVITY_OIL 43
MCF_GAS 235
TUBING_PRESS 285
Perforation Data:
Interval Top:6408 ft.# Of Holes:88
Interval Bottom:6668 ft.Hole Size:0.4 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 2/6/2020                  Interval Top: 6408 ft.    Interval Bottom: 6554 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:7/20/2012Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:7/16/2012Treatment End Date:7/16/2012
Treatment Summary:Pumped 3308 bbls of pHaserFrac fluid, 12bbl 15%HCL, 261100 lbs 20/40 sand
Total fluid used in treatment (bbls):3308Max pressure during treatment (psi):4020
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):12Min frac gradient (psi/ft):0.96
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):1186
Fresh water used in treatment (bbls):3296Disposition method For flowback:DISPOSAL
Total proppant used (lbs):261100Green completions techniques utilized:No
Reason green techniques Not utilized: PIPELINE
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:6408 ft.# Of Holes:48
Interval Bottom:6554 ft.Hole Size:0.4 in.
Primary Well Designation:
Out Of Service      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2029
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (TA)YLast Production
07/31/2018
Low ProducingYProduction Period
01/2025 - 12/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No