COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (02)
400182011
07/20/2011
1) Note surface casing setting depth change from 410’ to 470’. Increase cement coverage accordingly and cement to surface. 2) Provide 24 hour notice of MIRU to Bo Brown via e-mail at bo.brown@state.co.us. 3) Comply with Rule 317.i and provide cement coverage from TD to a minimum of 200' above Niobrara. Verify coverage with cement bond log.
EngineerForm: (04)
402126135
12/26/2019
This approval is good for one year and a new application must be made before July 29, 2020. Updates for the planned utilization of the well should be included with the application.
EngineerForm: (04)
402126135
12/26/2019
The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request.
EngineerForm: (04)
402447122
11/23/2020
With next year’s sundry provide a more specific plan forward. Merely specifying that the well will be plugged or RTP before the next MIT is not sufficient. EG. Bonanza Creek is working through a large backlog of PA work. Based on budgeting, Bonanza Creek currently plans to plug a total of AAA wells in in 2020, and BBB wells in 2021. Thus far, Bonanza Creek has plugged CCC wells in 2020 and is on track to meet our annual target. Currently, this well is planned to be plugged in 2021. This type of comment demonstrates that Bonanza Creek has a concrete plan forward and that said plan is being acted upon. Furthermore, this doesn't require an overly specific timeline for each well (which we understand is challenging to plan).
EngineerForm: (04)
402447122
11/23/2020
This approval is good for one year and a new application must be made before 7/29/21. Updates for the planned utilization of the well should be included with the application.
EngineerForm: (04)
402710317
08/13/2021
1) This approval is good for one year and a new application must be made before 7/19/2022. Updates for the planned utilization of the well should be included with the application.
EngineerForm: (04)
403096358
07/07/2022
1) This well is designated inactive and must be properly returned to production, plugged and abandoned, have an approved Form 5B or be submitted on a Form 6A (to be designated as Out of Service) no later than no later than November 1, 2022.
EngineerForm: (06)
404280828
07/21/2025
Prior to starting plugging operations a Bradenhead test shall be performed if there has not been a reported Bradenhead test within the 60 days immediately preceding the start of plugging operations. 1) If, before opening the Bradenhead valve, the beginning pressure is greater than 25 psi, sampling is required. 2) If pressure remains at the conclusion of the test, or if any liquids were present during the test, sampling is required. The Form 17 shall be submitted within 10 days of the test. Sampling shall comply with Operator Guidance - Bradenhead Testing and Reporting Instructions. If samples are collected, copies of all final laboratory analytical results shall be provided to the ECMC within three (3) months of collecting the samples.
EngineerForm: (06)
404280828
07/21/2025
Operator shall implement measures to control venting, to protect health and safety, and to ensure that vapors and odors from well plugging operations do not constitute a nuisance or hazard to public welfare.
EngineerForm: (06)
404280828
07/21/2025
1) Provide 2 business day notice of plugging MIRU via electronic Form 42, and provide 48 hours Notice of Plugging Operations, prior to mobilizing for plugging operations via electronic Form 42. These are 2 separate notifications, required by Rules 405.e and 405.I. 2) Prior to placing the 625’ plug: verify that all fluid migration (liquid and gas) has been eliminated. If evidence of fluid migration or pressure remains, contact ECMC Engineer for an update to plugging orders. 3) After isolation has been verified, pump surface casing shoe plug. If cement is not circulated to surface, shut-in, WOC 4 hours then tag plug – must be at 475’ or shallower and provide 10 sx plug at the surface. 4) Leave at least 100’ of cement in the wellbore for each plug without mechanical isolation. 5) After surface plug and prior to cap, verify isolation by either a 15 minute bubble test or 15 minute optical gas imaging recording. If there is indication of flow contact ECMC Engineering. Provide a statement on the 6SRA which method was used and what was observed. Retain records of final isolation test for 5 years. 6) With the Form 6 SRA operator must provide written documentation which positively affirms each COA listed above has been addressed.
EngineerForm: (06)
404280828
07/21/2025
FLOWLINE AND SITE CLOSURE 1)Consistent with Rule 911.a, a Form 27 must be approved prior to cut and cap, conducting flowline abandonment, or removing production equipment. Allow 30 days for Director review of the Form 27; include the Form 27 document number on the Form 44 for offsite flowline abandonment (if applicable) and on the Form 6 Subsequent. 2)Properly abandon flowlines per Rule 1105. If flowlines will be abandoned in place, include with the Form 27: pressure test results conducted in the prior 12 months as well as identification of any document numbers for a ECMC Spill/Release Report, Form 19, associated with the abandoned line.
OGLAForm: (06)
404280828
07/26/2025
Operator committed to the following Best Management Practices under the Technical Detail/ Comments section on the Submit Tab: Operator will use secondary containment for all tanks and other liquid containment.
 