Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-34096
Well Classification: OW Status: PA - 10/2/2025
Well Name/No:Antelope #43-17
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:BONANZA CREEK ENERGY OPERATING COMPANY LLC - 8960
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date10/2/2025
FacilityID:424583LocationID:424559
County:WELD #123Location:NESE 17 5N62W 6
Field:WATTENBERG - #90750Elevation:4691 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2172FSL  819 FELLat/Long: 40.398320 / -104.340780Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.398320 / -104.340770Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: AB - 10/2/2025             Measured TD: 6737 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        AB - 10/2/2025
Wellbore Permit
Permit #: Expiration Date:8/1/2013
Bottom Hole Location:Sec:17 Twp: 5N 62W Footage: 2172 FSL  819 FEL
Proposed Depth/Form:6900 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: , Unit Acreage: 40, Drill Unit: NESE
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 8.625 in., Top: 0 ft., Depth: 470 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 242, Top: 0 ft., Bottom: 470 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6900 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 200, Top: 6050 ft., Bottom: 6900 ft.

Wellbore Completed
Completion Date:10/16/2011
Spud Date:10/12/2011Spud Date Is:ACTUAL
Measured TD:6737 ft.Measured PB depth:6688 ft.
True Vertical TD:True Vertical PB depth:
Bottom Hole Location:Sec:17 Twp: 5N 62WFootage: 2172 FSL  819 FEL
Log Types:CBL, GR, CD, CN, Dl
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 8.625 in., Top: 0 ft., Depth: 525 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 520, Top: 0 ft., Bottom: 525 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6702 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 510, Top: 1700 ft., Bottom: 6702 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3402 ft.
SUSSEX4115 ft.
NIOBRARA6294 ft.
FORT HAYS6521 ft.
CODELL6547 ft.

Formation CODL                     Formation Classification:  OW                     Status:  CM - 12/6/2019                 Interval Top: 6548 ft.    Interval Bottom: 6556 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:6548 ft.# Of Holes:32
Interval Bottom:6556 ft.Hole Size:0.4 in.

Formation NB-CD                   Formation Classification:  OW                   Status:  AB - 10/2/2025                 Interval Top: 6298 ft.    Interval Bottom: 6556 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:11/5/2011
Treatment Summary:CODELL PUMPED 32,508 GAL PAD FLUID. PUMPED 102,732 GAL PHASERFRAC W/245,900 LBS 20/40 SAND. ISDP 3063 PSI, ATP 3377 PSI, ATR 22.3 BPM. NIOBRARA PUMPED 19,530 PAD FLUID. PUMPED 116,592 GAL PHASER FRAC W/260,630 LBS. PSI, 30/50 SAND. ISDP 2776 PSI ATP 3465 PSI, ATR 50.2 BPM.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 21
BBLS_OIL 65
BTU_GAS 1283
CALC_BBLS_H2O 21
CALC_BBLS_OIL 65
CALC_GOR 400
CALC_MCF_GAS 26
CASING_PRESS 790
GRAVITY_OIL 40
MCF_GAS 26
Perforation Data:
Interval Top:6298 ft.# Of Holes:80
Interval Bottom:6556 ft.Hole Size:0.4 in.

Formation NBRR                     Formation Classification:  OW                     Status:  CM - 12/6/2019                 Interval Top: 6298 ft.    Interval Bottom: 6448 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:6298 ft.# Of Holes:48
Interval Bottom:6448 ft.Hole Size:0.4 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY10/02/2025
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2029
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No