| Permit | Form: (02) 400163469 06/24/2011 | Encana must submit all logs run including open-hole logs should they be run on this well. |
| Engineer | Form: (02) 400163469 06/28/2011 | 1)Provide 24 hour notice of MIRU to Bo Brown via e-mail at bo.brown@state.co.us.
2)Comply with Rule 317.i and provide cement coverage from TD to a minimum of 200' above the Niobrara and from 200’ below Sussex to 200’ above Sussex. Verify coverage with cement bond log.
3)Comply with Rule 321. Run and submit Directional Survey from TD to base of surface casing. Ensure that the wellbore complies with setback requirements in commission orders or rules prior to producing the well.
|