Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-33996
Well Classification: GW Status: SI - 5/1/2025
Well Name/No:ARISTOCRAT ANGUS #4-8-4
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date5/1/2025
FacilityID:424349LocationID:332754
County:WELD #123Location:SESW 4 3N65W 6
Field:WATTENBERG - #90750Elevation:4820 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:761FSL  1935 FWLLat/Long: 40.249210 / -104.670770Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.249213 / -104.670784Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 8/15/2012
End Date: 8/15/2012
Reported: 9/19/2012
Days to report: 35
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 5/1/2025             Measured TD: 7880 ft.    Vertical TD: 7764 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 5/1/2025
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:7/18/2013
Proposed Top PZ Location:Sec:4 Twp: 3N 65W Footage: 50   2582 
Bottom Hole Location:Sec:4 Twp: 3N 65W Footage: 50 FSL  2582 FEL
Proposed Depth/Form:7476 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 232-32 , Unit Acreage: 160, Drill Unit: GWA
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 232-32 , Unit Acreage: 160, Drill Unit: GWA
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 600 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 219, Top: 0 ft., Bottom: 600 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7476 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 114, Top: 6768 ft., Bottom: 7476 ft.

Wellbore Completed
Completion Date:7/19/2012
Spud Date:7/13/2012Spud Date Is:ACTUAL
Measured TD:7880 ft.Measured PB depth:7818 ft.
True Vertical TD:7764 ft.True Vertical PB depth:7702 ft.
Top PZ Location:Sec:4 Twp: 3N 65WFootage: 44 FSL  2574 FEL
Bottom Hole Location:Sec:4 Twp: 3N 65WFootage: 28 FSL  2575 FEL
Log Types:CBL, Dual Ind/Compensated Density/Compensated Neutron
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 632 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 257, Top: 0 ft., Bottom: 641 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7864 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 695, Top: 2865 ft., Bottom: 7880 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4473 ft.
NIOBRARA6982 ft.
CODELL7273 ft.
J SAND7734 ft.

Formation JSND                     Formation Classification:  GW                     Status:  SI - 5/1/2025                  Interval Top: 7750 ft.    Interval Bottom: 7790 ft.

 Completed Information for Formation J SAND
1st Production Date:1/4/2013Choke Size: 
Formation Name:J SANDCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/5/2012Treatment End Date:9/7/2012
Treatment Summary:Frac'd the J-Sand 7750-7758’, 7774-7790’, (48 holes)w/ 66,108 gal 18 # Vistar Hybrid cross linked gel containing 250,140 # 20/40 Sand. 08-13-12
Total fluid used in treatment (bbls):3911Max pressure during treatment (psi):4436
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.61
Recycled water used in treatment (bbls):3911Total flowback volume recovered (bbls):396
Fresh water used in treatment (bbls):Disposition method For flowback:DISPOSAL
Total proppant used (lbs):250040Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation JSND.
Perforation Data:
Interval Top:7750 ft.# Of Holes:48
Interval Bottom:7790 ft.Hole Size:0.42 in.

Formation CODL                     Formation Classification:  GW                     Status:  CM - 3/7/2013                  Interval Top: 7274 ft.    Interval Bottom: 7288 ft.

 Completed Information for Formation CODELL
1st Production Date:1/4/2013Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/5/2012Treatment End Date:9/11/2012
Treatment Summary:Set CFP @ 7340'. 08-13-12 Frac'd the Codell 7,274’ – 7,288’ (42 holes) w/ 92,694 gal 22# Vistar Hybrid cross linked gel containing 250,500 # 30/50 sand. 08-14-12
Total fluid used in treatment (bbls):2831Max pressure during treatment (psi):5882
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.71
Recycled water used in treatment (bbls):2831Total flowback volume recovered (bbls):396
Fresh water used in treatment (bbls):Disposition method For flowback:DISPOSAL
Total proppant used (lbs):250500Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:7274 ft.# Of Holes:42
Interval Bottom:7288 ft.Hole Size:0.42 in.

Formation JNBCD                   Formation Classification:  GW                   Status:  CM - 1/6/2013                  Interval Top: 6999 ft.    Interval Bottom: 7790 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:1/4/2013Choke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:1/6/2013Treatment End Date:N/A
Treatment Summary:Set CBP @ 6960'. 09-06-12 Drilled out CBP and CFP's to commingle the JSND-NBRR-CDL. 09-07-12 The BTU and API information is not available at this time.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7717 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/6/2013Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 24
BBLS_OIL 70
BTU_GAS 1239
CALC_BBLS_H2O 24
CALC_BBLS_OIL 70
CALC_GOR 20086
CALC_MCF_GAS 1406
CASING_PRESS 1183
GRAVITY_OIL 62
MCF_GAS 1406
TUBING_PRESS 696
Perforation Data:
Interval Top:6999 ft.# Of Holes:118
Interval Bottom:7790 ft.Hole Size:0.42 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  SI - 5/1/2025                  Interval Top: 6999 ft.    Interval Bottom: 7822 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:1/4/2013Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:6999 ft.# Of Holes:70
Interval Bottom:7822 ft.Hole Size:0.42 in.

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 3/7/2013                  Interval Top: 6999 ft.    Interval Bottom: 7154 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:1/3/2013Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/5/2012Treatment End Date:9/7/2012
Treatment Summary:Set CFP @ 7190'. 08-14-12 Frac'd the Niobrara 6999-7000.5, 7058-7060.5, 7151-7154' (28 holes), w/ 96,978 gals 18 # Vistar Hybrid cross linked gel containing 250,120 # 30/50 sand. 08-15-12
Total fluid used in treatment (bbls):3388Max pressure during treatment (psi):6738
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.92
Recycled water used in treatment (bbls):3388Total flowback volume recovered (bbls):396
Fresh water used in treatment (bbls):Disposition method For flowback:DISPOSAL
Total proppant used (lbs):250120Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:6999 ft.# Of Holes:28
Interval Bottom:7154 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)272
Total Gas Produced (MCF)6811
GOR25040
GOR DeterminationMCFE
Average BOE per Day4.037
Average MCFE per Day23.400

 Federal Financial Assurance  i 

 Tribal Well  i No