Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-123-33087TIMBRO FEDERAL LD
17-76 HN
NOBLE ENERGY INC
100322
PR
5/1/2024
DJ HORIZONTAL NIOBRARA
16950
WELD  123
SESW 17 9N58W 6
421829View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (02 )
400128090
2/4/2011
1) Provide 24 hr notice of MIRU to Colby Horton at 970-370-0040 or colby.horton@state.co.us. 2) Set surface casing per Rule 317d, cement to surface. Setting surface casing less than the approved depth is a permit violation unless prior written approval is obtained from the COGCC. 3) If completed, provide cement coverage from the intermediate casing shoe to a minimum of 200' above Niobrara. Verify cement with a cement bond log. 4) Comply with Rule 321. Run and submit Directional Survey from TD to base of surface casing. Ensure that the wellbore complies with setback requirements in commission orders or rules prior to producing the well.
PermitForm: (02 )
400128090
3/1/2011
PROPOSED HORIZONTAL WELL BORE IS TO BE DRILLED INTO UNLEASED FEDERAL MINERALS. OPERATOR DISCUSSION WITH BLM REQUIRED: UNLEASED FEDERAL MINERALS CANNOT BE DRILLED UPON/PRODUCED REGARDLESS OF SPACING ORDER: REQUIRED SETBACKS TO BE MAINTAINED---INTERAGENCY DISCUSSION PURSUANT TO MOU COGCC,BLM,USFS 6-24-09 H.2.d
 
COGIS - Best Management Practice Results
No records to display.