Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-33087
Well Classification: OW Status: PR - 5/1/2024
Well Name/No:TIMBRO FEDERAL LD #17-76 HN
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:NOBLE ENERGY INC - 100322
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/1/2024
FacilityID:421843LocationID:421829
County:WELD #123Location:SESW 17 9N58W 6
Field:DJ HORIZONTAL NIOBRARA - #16950Elevation:4868 ft.
Planned Location:501FSL  2412 FWLLat/Long: 40.745272 / -103.888994Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.745262 / -103.888992Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 3/5/2013
End Date: 3/6/2013
Reported: 10/14/2013
Days to report: 222
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 5/1/2024             Measured TD: 10251 ft.    Vertical TD: 5909 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 5/1/2024
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:3/2/2013
Prop Depth/Form:10276 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 535-3 , Unit Acreage: 640, Drill Unit: ALL
Casing:String Type: CONDUCTOR, Hole Size: 20 in., Size: 16 in., Top: 0 ft., Depth: 60 ft., Weight: 42 , Citings Type: PLANNED
Cement:Sacks: 50, Top: 0 ft., Bottom: 60 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 800 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 420, Top: 0 ft., Bottom: 800 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6178 ft., Weight: 23 , Citings Type: PLANNED
Cement:Sacks: 655, Top: 0 ft., Bottom: 6178 ft.
Casing:String Type: 1ST LINER, Hole Size: 6 in., Size: 4.5 in., Top: 5428 ft., Depth: 10276 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 300, Top: 5428 ft., Bottom: 10276 ft.

Wellbore Completed
Completion Date:2/14/2013
Spud Date:2/3/2013Spud Date Is:ACTUAL
Measured TD:10251 ft.Measured PB depth:10251 ft.
True Vertical TD:5909 ft.True Vertical PB depth:5909 ft.
Top PZ Location:Sec:17 Twp: 9N 5WFootage: 869 FSL  1966 FWLDepth
Bottom Hole Location:Sec:17 Twp: 9N 58WFootage: 677 FNL  1856 FWLDepth
Log Types:CBL, MUD, GR
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 130 ft., Weight: 42.09 , Citings Type: ACTUAL
Cement:Sacks: 160, Top: 0 ft., Bottom: 130 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 663 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 342, Top: 0 ft., Bottom: 663 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6387 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 500, Top: 910 ft., Bottom: 6387 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 4.5 in., Top: 6201 ft., Depth: 10236 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
PIERRE2503 ft.
PARKMAN3386 ft.
SUSSEX4120 ft.
SHANNON4543 ft.
TEEPEE BUTTES5209 ft.
NIOBRARA5992 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 5/1/2024                  Interval Top: 6476 ft.    Interval Bottom: 10167 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:3/16/2013Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:3/5/2013Treatment End Date:3/5/2013
Treatment Summary:FRAC'D W/2183990 GAL SILVERSTIM AND SLICK WATER AND 2998058# OTTAWA SAND
Total fluid used in treatment (bbls):51999Max pressure during treatment (psi):4278
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:20
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.88
Recycled water used in treatment (bbls):48729Total flowback volume recovered (bbls):7338
Fresh water used in treatment (bbls):3270Disposition method For flowback:RECYCLE
Total proppant used (lbs):2998058Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.875 in.Tubing Setting Depth:6207 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/22/2013Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 290
BBLS_OIL 472
BTU_GAS 1345
CALC_BBLS_H2O 290
CALC_BBLS_OIL 472
CALC_GOR 648
CALC_MCF_GAS 306
CASING_PRESS 967
GRAVITY_OIL 37
MCF_GAS 306
TUBING_PRESS 371
Perforation Data:
Interval Top:6476 ft.# Of Holes:0
Interval Bottom:10167 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
August 2023 - July 2024i
Total Oil Produced (Barrels)4728
Total Gas Produced (MCF)12770
GOR2700
GOR DeterminationBOE
Average BOE per Day18.875
Average MCFE per Day109.489

 Federal Financial Assurance  i 

 Tribal Well  i No