Engineer | Form: (02 ) 400071269 9/3/2010 |
1) Provide 24 hour notice of MIRU to Bo Brown at 970-397-4124 or e-mail at bo.brown@state.co.us.
2) Comply with Rule 317.i and provide cement coverage from TD to a minimum of 200' above Niobrara and from 200’ below Shannon to 200’ above Shannon. Verify coverage with cement bond log.
3) Comply with Rule 321. Run and submit Directional Survey from TD to base of surface casing. Ensure that the wellbore complies with setback requirements in commission orders or rules prior to producing the well.
|
Engineer | Form: (02 ) 400359020 12/27/2012 | 1)Provide notice of MIRU via an electronic Form 42.
2)Comply with Rule 317.i and provide cement coverage from the 4.5” casing TD to a minimum of 200' above the Niobrara and from 200’ below Shannon to 200’ above Shannon. Verify coverage with a cement bond log. |
Permit | Form: (02 ) 400359020 12/27/2012 | Operator must meet Water Well Testing requirements as per amended Rule 318Ae(4) |