Engineer | Form: (06 ) 401035792 5/10/2016 | 1) Submit Form 42 electronically to COGCC 48 hours prior to MIRU.
2) For 680’ plug: pump plug and displace. If cement is not circulated to surface, shut-in, WOC 4 hours and tag plug – must be 530’ or shallower and provide minimum 10 sx plug at the surface. Leave at least 100’ of cement in the wellbore for each plug.
3) Properly abandon flowlines. Once flowlines are properly abandoned, file electronic form 42. |
Engineer | Form: (06 ) 401035792 5/10/2016 | Prior to initiation of plugging operations, a bradenhead test shall be performed. If any pressure remains at the conclusion of the test or any liquids were present call COGCC Engineer for sampling requirements. Form 17 shall be submitted within 10 days. |