Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-26816
Well Classification: OW Status: PA - 6/14/2016
Well Name/No:WELLS RANCH AA #21-08
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:NOBLE ENERGY INC - 100322
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date6/14/2016
FacilityID:296520LocationID:310693
County:WELD #123Location:SENE 21 6N63W 6
Field:WATTENBERG - #90750Elevation:4718 ft.
Planned Location:2077FNL  735 FELLat/Long: 40.473644 / -104.435089Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.473630 / -104.435127Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 6/14/2016             Measured TD: 6924 ft.    Vertical TD: 6924 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 6/14/2016
Wellbore PermitDRIFTED
Permit #:20082196 Expiration Date:6/15/2009
Proposed Depth/Form:6930 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: E/2NE
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 80, Drill Unit: E/2NE

Wellbore Completed
Completion Date:7/21/2008
Spud Date:7/19/2008Spud Date Is:ACTUAL
Measured TD:6924 ft.Measured PB depth:6906 ft.
True Vertical TD:6924 ft.True Vertical PB depth:6906 ft.
Log Types:CBL/GR/CCL, CDL/CN/ML, DIL/GR
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 580 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 280, Top: 0 ft., Bottom: 580 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6924 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 740, Top: 1374 ft., Bottom: 6924 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
NIOBRARA6499 ft.NN
FORT HAYS6731 ft.NN
CODELL6755 ft.NN
GREENHORN6832 ft.NN

Formation CODL                     Formation Classification:  GW                     Status:  CM - 9/5/2008                  Interval Top: 6756 ft.    Interval Bottom: 6767 ft.

 Completed Information for Formation CODELL
1st Production Date:8/26/2008Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/25/2008
Treatment Summary:CODL FRAC'D W/ 1008 GALS 15% HCI ACID; 141,708 GALS SILVERSTIM; 3570 GALS SLICKWATER & 270,142# 20/40 OTTAWA SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CODL.
Perforation Data:
Interval Top:6756 ft.# Of Holes:44
Interval Bottom:6767 ft.Hole Size:0.42 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 6/14/2016                 Interval Top: 6567 ft.    Interval Bottom: 6767 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:8/26/2008Choke Size:0.313 in.
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/21/2008
Treatment Summary:COMMINGLE CODELL & NIOBRARA. CODELL PRODUCING THROUGH CAST IRON FLOW PLUG FROM FIRST PROD.DATE OF 5/26/08 UNTIL TUBING WAS LANDED ON 10/2/08.
Tubing Size:2.375 in.Tubing Setting Depth:6746 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/5/2008Test Method:FLOWING
Hours Tested:24Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 10
BBLS_OIL 53
BTU_GAS 1231
CALC_BBLS_H2O 10
CALC_BBLS_OIL 53
CALC_GOR 2679
CALC_MCF_GAS 142
CASING_PRESS 270
GRAVITY_OIL 58
MCF_GAS 142
Perforation Data:
Interval Top:6567 ft.# Of Holes:124
Interval Bottom:6767 ft.Hole Size:

Formation NBRR                     Formation Classification:  GW                     Status:  CM - 9/5/2008                  Interval Top: 6567 ft.    Interval Bottom: 6587 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:8/26/2008Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/25/2008
Treatment Summary:NBRR FRAC'D W/ 1,000 GALS 15% HCI ACID; 185,396 GALS SILVERSTIM & SLICKWATER; AND 252,470# 20/40 OTTAWA SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBRR.
Perforation Data:
Interval Top:6567 ft.# Of Holes:80
Interval Bottom:6587 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY06/14/2016
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2023 - November 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No