COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (06)
402626318
03/16/2021
Per COGCC Order 1-232, Bradenhead tests shall be performed according to the following schedule and Form 17 submitted within 10 days of each test: 1) Within 60 days of rig release, prior to stimulation. If any pressure greater than 200 psi, must contact COGCC engineer prior to stimulation. 2) If a delayed completion, 6 months after rig release and prior to stimulation. If any pressure greater than 200 psi, must contact COGCC engineer prior to stimulation. 3) A post-production test within 60 days after first sales, as reported on the Form 10, Certificate of Clearance.
EngineerForm: (06)
402626318
03/16/2021
Operator shall implement measures to control venting, to protect health and safety, and to ensure that vapors and odors from well plugging operations do not constitute a nuisance or hazard to public welfare.
EngineerForm: (06)
402626318
03/16/2021
1)1) Provide 2 business day notice of plugging MIRU via electronic Form 42. 2)2) After placing the shallowest hydrocarbon isolating plug (2020'), operator must wait a sufficient time to confirm static conditions. If at any time after placing this plug there is evidence of pressure or of fluid migration, contact COGCC engineering before continuing operations. 3)3) Prior to placing the 1310’ plug: verify that all fluid migration (liquid and gas) has been eliminated. If evidence of fluid migration or pressure remains, contact COGCC Engineer for an update to plugging orders. 4)4) After isolation has been verified, pump plug and displace. If cement is not circulated to surface, shut-in, WOC 4 hours then tag plug – must be at 1157’ or shallower and provide 10 sx plug at the surface. 5)5) Leave at least 100’ of cement in the wellbore for each plug. 6)6) Properly abandon flowlines as per Rule 1105. Pursuant to Rule 911.a. Closure of Oil and Gas Facilities, Operator will submit Site Investigation and Remediation Workplans via Form 27 for COGCC prior approval before cutting and capping the plugged well, conducting flowline abandonment, and removing production equipment. Pursuant to Rule 1105.f. Abandonment Verification, within 90 days of an operator completing abandonment requirements for a flowline or crude oil transfer line, an operator must submit a Field Operations Notice, Form 42-Abandonment of Flowlines for on-location flowlines, and a Flowline Report, Form 44, for off-location flowlines or crude oil transfer lines. 7)7) With the Form 6 SRA operator must provide written documentation which positively affirms each COA has been addressed.
OGLAForm: (06)
402626318
03/19/2021
This oil and gas location is within a CPW-mapped bald eagle roost or communal roost High Priority Habitat. If the P&A activities take place from November 15 to March 15, and if there is direct line of sight within 0.5 mile from an active roost to the activity, Operator will not start operations with heavy machinery until two hours after sunrise and cease operations two hours before sunset.
 
COGIS - Best Management Practice Results
No records to display.