|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 7/12/2021 Measured TD: 8010 ft. Vertical TD: 7740 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 7/12/2021 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 6/30/2012 | | Proposed Top PZ Location: | Sec:28 Twp: 6N 67W | Footage: 2548 2526 | | Bottom Hole Location: | Sec:28 Twp: 6N 67W | Footage: 2548 2526 | | Proposed Depth/Form: | 8026 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 318A , Unit Acreage: 160, Drill Unit: GWA | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407.87 , Unit Acreage: 160, Drill Unit: GWA | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 1206 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 690, Top: 0 ft., Bottom: 1206 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7994 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 1020, Top: 1100 ft., Bottom: 7994 ft. |
| | |
| Wellbore Completed | | Completion Date: | 1/15/2008 | | Spud Date: | 1/6/2008 | Spud Date Is: | ACTUAL | | Measured TD: | 8010 ft. | Measured PB depth: | 7959 ft. | | True Vertical TD: | 7740 ft. | True Vertical PB depth: | 7689 ft. | | Top PZ Location: | Sec:28 Twp: 6N 67W | Footage: 2548 FSL 2526 FWL | | Bottom Hole Location: | Sec:28 Twp: 6N 67W | Footage: 2548 FSL 2526 FWL | | Log Types: | CBL, MUD, P/E AILC-CNLD-ML | | Casing: | String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 1207 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 690, Top: 0 ft., Bottom: 1207 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7994 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 1020, Top: 1100 ft., Bottom: 7994 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3588 ft. | | N | N | | SUSSEX | 4230 ft. | | N | N | | SHANNON | 4740 ft. | | N | N | | NIOBRARA | 7072 ft. | | N | N | | FORT HAYS | 7368 ft. | | N | N | | CODELL | 7390 ft. | | N | N | | J SAND | 7862 ft. | | N | N |
Formation CODL Formation Classification: GW Status: CM - 6/8/2010 Interval Top: 7390 ft. Interval Bottom: 7404 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 5/21/2008 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/6/2008 | | Treatment Summary: | 167,693 GALS FLUID & 115,580# 30/50 SAND & 4000# 20/40 SAND |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7390 ft. | # Of Holes: | 56 | | Interval Bottom: | 7404 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 8/4/2021 Interval Top: 7078 ft. Interval Bottom: 7404 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 5/21/2008 | Choke Size: | 0.156 in. | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 1/15/2008 | | Treatment Summary: | |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7383 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 7/8/2008 | Test Method: | FLOWING | | Hours Tested: | | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1312 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 58 | | CALC_GOR | 1000 | | CALC_MCF_GAS | 58 | | CASING_PRESS | 1400 | | GRAVITY_OIL | 51 | | TUBING_PRESS | 1650 |
| | Perforation Data: | | Interval Top: | 7078 ft. | # Of Holes: | 180 | | Interval Bottom: | 7404 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 6/8/2010 Interval Top: 7078 ft. Interval Bottom: 7290 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 5/21/2008 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/6/2008 | | Treatment Summary: | 386,679 GALS FLUID & 300,0230# 30/50 SAND & 8000# 20/40 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7078 ft. | # Of Holes: | 124 | | Interval Bottom: | 7290 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 08/04/2021 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|