COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (06)
402614331
03/02/2021
Prior to starting plugging operations a Bradenhead test shall be performed if there has not been a reported Bradenhead test within the 60 days immediately preceding the start of plugging operations. 1) If, before opening the Bradenhead valve, the beginning pressure is greater than 25 psi, sampling is required. 2) If pressure remains at the conclusion of the test, or if any liquids were present during the test, sampling is required. The Form 17 shall be submitted within 10 days of the test. Sampling shall comply with Operator Guidance - Bradenhead Testing and Reporting Instructions. If samples are collected, copies of all final laboratory analytical results shall be provided to the COGCC within three (3) months of collecting the samples.
EngineerForm: (06)
402614331
03/02/2021
Operator shall implement measures to control venting, to protect health and safety, and to ensure that vapors and odors from well plugging operations do not constitute a nuisance or hazard to public welfare.
EngineerForm: (06)
402614331
03/02/2021
1) Provide 2 business days notice of plugging MIRU via electronic Form 42. 2)Prior to placing the 805’ plug: verify that all fluid migration (liquid or gas) has been eliminated. If evidence of fluid migration or pressure remains, contact COGCC Engineer for an update to plugging orders. 3)After isolation has been verified, pump plug and displace. If cement is not circulated to surface, shut-in, WOC 4 hours then tag plug – must be at 652’ or shallower and provide 10 sx plug at the surface. 4)Leave at least 100’ of cement in the wellbore for each plug. 5)Properly abandon flowlines as per rule 1105. Pursuant to Rule 911.a. Closure of Oil and Gas Facilities, Operator will submit Site Investigation and Remediation Workplans via Form 27 for COGCC prior approval before plugging the well, conducting flowline abandonment, and removing production equipment. Pursuant to Rule 1105.f. Abandonment Verification, within 90 days of an operator completing abandonment requirements for a flowline or crude oil transfer line, an operator must submit a Field Operations Notice, Form 42-Abandonment of Flowlines for on-location flowline, and a Flowline Report, Form 44, for an off-location flowline or crude oil transfer line. 6)With the Form 6 SRA operator must provide written documentation which positively affirms each COA has been addressed. 7)After placing the shallowest hydrocarbon isolating plug (2000'), operator must wait a sufficient time to confirm static conditions. If at any time after placing this plug there is evidence of pressure or fluid migration, contact COGCC engineering before continuing operations.
OGLAForm: (06)
402614331
03/19/2021
This oil and gas location is within a CPW-mapped bald eagle roost or communal roost High Priority Habitat. If the P&A activities take place from November 15 to March 15, and if there is direct line of sight within 0.5 mile from an active roost to the activity, Operator will not start operations with heavy machinery until two hours after sunrise and cease operations two hours before sunset.
 
COGIS - Best Management Practice Results
No records to display.