|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 7/7/2021 Measured TD: 7840 ft. Vertical TD: 7769 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 7/7/2021 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 7/18/2013 | | Proposed Top PZ Location: | Sec:28 Twp: 6N 67W | Footage: 1317 FSL 1317 FWL | | Bottom Hole Location: | Sec:28 Twp: 6N 67W | Footage: 1317 FSL 1317 FWL | | Proposed Depth/Form: | 7880 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: S/2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 320, Drill Unit: S/2 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 702 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 320, Top: 16 ft., Bottom: 702 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7813 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 1106, Top: 450 ft., Bottom: 7813 ft. |
| | |
| Wellbore Completed | | Completion Date: | 12/29/2007 | | Spud Date: | 12/21/2007 | Spud Date Is: | ACTUAL | | Measured TD: | 7840 ft. | Measured PB depth: | 7782 ft. | | True Vertical TD: | 7769 ft. | True Vertical PB depth: | 7711 ft. | | Top PZ Location: | Sec:28 Twp: 6N 67W | Footage: 1317 FSL 1317 FWL | | Bottom Hole Location: | Sec:28 Twp: 6N 67W | Footage: 1317 FSL 1317 FWL | | Log Types: | CBL, P/E AILC-NCLD-ML | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 702 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 320, Top: 0 ft., Bottom: 702 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7813 ft., Weight: 11.60 , Citings Type: ACTUAL | | Cement: | Sacks: 1106, Top: 450 ft., Bottom: 7813 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3458 ft. | | N | N | | SUSSEX | 4146 ft. | | N | N | | SHANNON | 4547 ft. | | N | N | | TEEPEE BUTTES | 6533 ft. | | N | N | | NIOBRARA | 6870 ft. | | N | N | | FORT HAYS | 7177 ft. | | N | N | | CODELL | 7199 ft. | | N | N | | J SAND | 7654 ft. | | N | N |
Formation CODL Formation Classification: GW Status: CM - 6/23/2011 Interval Top: 7200 ft. Interval Bottom: 7214 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 6/2/2008 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/13/2008 | | Treatment Summary: | 168,573 GALS FLUID & 115,560# 30/50 SAND & 4,000# 20/40 SAND |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7200 ft. | # Of Holes: | 56 | | Interval Bottom: | 7214 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 7/7/2021 Interval Top: 6874 ft. Interval Bottom: 7214 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 6/2/2008 | Choke Size: | 0.156 in. | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/29/2007 | | Treatment Summary: | |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7185 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 7/10/2008 | Test Method: | FLOWING | | Hours Tested: | | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1310 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 59 | | CALC_GOR | 1594 | | CALC_MCF_GAS | 94 | | CASING_PRESS | 1560 | | GRAVITY_OIL | 52 | | TUBING_PRESS | 650 |
| | Perforation Data: | | Interval Top: | 6874 ft. | # Of Holes: | 170 | | Interval Bottom: | 7214 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 6/23/2011 Interval Top: 6874 ft. Interval Bottom: 7110 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 6/2/2008 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/13/2008 | | Treatment Summary: | 254,680 GALS FLUID & 375,100# 30/50 SAND & 8,000# 20/40 SAND |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 6874 ft. | # Of Holes: | 114 | | Interval Bottom: | 7110 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 07/07/2021 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|