WELL05-123-26359REESE
8-15
KERR MCGEE OIL & GAS ONSHORE LP
47120
PA
11/28/2016
WATTENBERG
90750
WELD  123
SWNE 15 2N68W 6
336504View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (02 )
2583446
8/11/2010
1) Digital logs from original completion are still outstanding and required (requested 5/21/09)
EngineerForm: (04 )
400665023
8/19/2014
The additional cement referenced shall be placed as indicated and comply with Rule 317.i. The placed cement shall be verified with a CBL and documented with a Form 5 Drilling Completion Report.
EngineerForm: (06 )
401121669
10/16/2016
1) Prior to starting plugging operations, a bradenhead test shall be performed. If any pressure remains at the conclusion of the test or any liquids were present contact COGCC Engineer for sampling requirements. The Form 17 shall be submitted within 10 days of the test. 2) Provide 48 hour notice of plugging MIRU via electronic Form 42. 3) Properly abandon flowlines as per Rule 1103. File electronic Form 42 once abandonment complete. 4) Plug listed as half in-half out surface casing is also production casing stub plug. After pumping stub/shoe plug, shut down and wait on cement at minimum 4 hours; verify gas migration has been eliminated. If evidence of gas migration or pressure remains contact COGCC Engineer for an update to plugging orders. This plug must be tagged at 156' or 50' above where casing is cut-whichever is shallower. Leave at least 100’ cement in the casing for each plug.
 
COGIS - Best Management Practice Results
No records to display.