|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 11/28/2016 Measured TD: 8239 ft. Vertical TD: 7982 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 11/28/2016 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 8/26/2012 | Proposed Top PZ Location: | Sec:15 Twp: 2N 68W | Footage: 1983 FNL 662 FEL | Bottom Hole Location: | Sec:15 Twp: 2N 68W | Footage: 1983 FNL 662 FEL | Proposed Depth/Form: | 8238 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: N/2 | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 80, Drill Unit: S2NE4 | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 765 ft., Weight: 24 , Citings Type: PLANNED | Cement: | Sacks: 347, Top: 0 ft., Bottom: 765 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8231 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 500, Top: 2950 ft., Bottom: 8231 ft. |
| | |
Wellbore Completed | Completion Date: | 3/23/2008 | Spud Date: | 3/16/2008 | Spud Date Is: | ACTUAL | Measured TD: | 8239 ft. | Measured PB depth: | 8212 ft. | True Vertical TD: | 7982 ft. | True Vertical PB depth: | 7955 ft. | Top PZ Location: | Sec:15 Twp: 2N 68W | Footage: 1983 FNL 662 FEL | Bottom Hole Location: | Sec:15 Twp: 2N 68W | Footage: 1971 FNL 662 FEL | Log Types: | CBL, P/E AILC-CNLD-ML | Log Types: | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 765 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 347, Top: 0 ft., Bottom: 765 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8231 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 250, Top: 7128 ft., Bottom: 8239 ft., Determination Method: CBL | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 8231 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 360, Top: 206 ft., Bottom: 1626 ft., Determination Method: CBL | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 5263 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 250, Top: 2950 ft., Bottom: 5150 ft., Determination Method: CBL | Additional Cement: | String Type: 1ST , Top: 206 ft., Depth: 1614 ft., Bottom: 1624 ft., Sacks: 360, Method: 1 INCH | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 4056 ft. | | N | N | SUSSEX | 4476 ft. | 4535 ft. | N | N | SHANNON | 4948 ft. | 4979 ft. | N | N | NIOBRARA | 7425 ft. | | N | N | FORT HAYS | 7667 ft. | | N | N | CODELL | 7687 ft. | | N | N | J SAND | 8113 ft. | | N | N |
Formation JSND Formation Classification: OW Status: AB - 11/28/2016 Interval Top: 8132 ft. Interval Bottom: 8146 ft. Completed Information for Formation J SAND | 1st Production Date: | 12/2/2011 | Choke Size: | | Formation Name: | J SAND | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 11/21/2011 | Treatment Summary: | Frac J-Sand down 4-1/2" Csg w/ 163,884 gal Slickwater w/ 159,140# 40/70, 4,140# SB Excel. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| Perforation Data: | Interval Top: | 8132 ft. | # Of Holes: | 42 | Interval Bottom: | 8146 ft. | Hole Size: | 0.38 in. |
|
Formation CODL Formation Classification: GW Status: CM - 1/18/2012 Interval Top: 7692 ft. Interval Bottom: 7706 ft. Completed Information for Formation CODELL | 1st Production Date: | 10/28/2008 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 4/22/2008 | Treatment Summary: | 168,340 GALS FLUID & 119,320# 40/70 SAND & 4000 20/40 SB EXCEL |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 7692 ft. | # Of Holes: | 56 | Interval Bottom: | 7706 ft. | Hole Size: | 0.38 in. |
|
Formation JNBCD Formation Classification: OW Status: CM - 12/18/2011 Interval Top: 7427 ft. Interval Bottom: 8146 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | 12/2/2011 | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 11/21/2011 | Treatment Summary: | JSND REC |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 12/18/2011 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | WET | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_OIL | 8 | BTU_GAS | 1283 | CALC_BBLS_OIL | 8 | CALC_GOR | 5500 | CALC_MCF_GAS | 44 | CASING_PRESS | 1504 | GRAVITY_OIL | 53 | MCF_GAS | 44 |
| Perforation Data: | Interval Top: | 7427 ft. | # Of Holes: | 167 | Interval Bottom: | 8146 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 11/28/2016 Interval Top: 7427 ft. Interval Bottom: 7706 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 10/28/2008 | Choke Size: | 0.219 in. | Formation Name: | NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 3/23/2008 | Treatment Summary: | |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 11/25/2008 | Test Method: | FLOWING | Hours Tested: | | Gas Type: | SHALE | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BTU_GAS | 1270 | CALC_BBLS_H2O | 0 | CALC_BBLS_OIL | 35 | CALC_GOR | 9143 | CALC_MCF_GAS | 320 | CASING_PRESS | 1120 | GRAVITY_OIL | 51 |
| Perforation Data: | Interval Top: | 7427 ft. | # Of Holes: | 125 | Interval Bottom: | 7706 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 1/18/2012 Interval Top: 7427 ft. Interval Bottom: 7578 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 10/28/2008 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 4/24/2008 | Treatment Summary: | 1,000 GALS ACID & 173,376 GALS FLUID & 250,160# 30/50 SAND & 4,000# 20/40 SB EXCEL |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 7427 ft. | # Of Holes: | 69 | Interval Bottom: | 7578 ft. | Hole Size: | 0.41 in. |
|
|
|
|
|
Reported Plugged | Y | 11/28/2016 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|