Engineer | Form: (04 ) 400670025 8/27/2014 | The additional cement referenced shall be placed as indicated and comply with Rule 317.i. The placed cement shall be verified with a CBL and documented with a Form 5 Drilling Completion Report. |
Engineer | Form: (06 ) 401730672 1/9/2019 | Prior to starting plugging operations a bradenhead test shall be performed if there has not been a reported bradenhead test within the 60 days immediately preceding the start of plugging operations.
1) If, before opening the bradenhead valve, the beginning pressure is greater than 25 psi, sampling is required.
2) If pressure remains at the conclusion of the test, or if any liquids were present during the test, sampling is required.
The Form 17 shall be submitted within 10 days of the test. Sampling shall comply with Operator Guidance - Bradenhead Testing and Reporting Instructions. If samples are collected, copies of all final laboratory analytical results shall be provided to the COGCC within three (3) months of collecting the samples. |
Engineer | Form: (06 ) 401730672 1/9/2019 | Operator shall implement measures to control venting, to protect health and safety, and to ensure that vapors and odors from well plugging operations do not constitute a nuisance or hazard to public welfare.
|
Engineer | Form: (06 ) 401730672 1/9/2019 | 1) Provide 48 hour notice of plugging MIRU via electronic Form 42.
2) Properly abandon on-location flowlines per Rule 1105. File electronic Form 42 once abandonment complete. Within 30 days of an operator completing abandonment requirements for an off-location flowline or crude oil transfer line the operator must submit a Flowline Report, Form 44.
3) After pumping squeeze, shut down and shut well in at minimum 8 hours; verify gas and liquid migration has been eliminated. If evidence of gas migration or pressure remains contact COGCC Engineer for an update to plugging orders. |
Engineer | Form: (04 ) 402374235 8/17/2020 | 1. Operator shall implement measures to control venting, to protect health and safety, and to ensure that vapors and odors from well operations do not constitute a nuisance or hazard to public welfare.
2. Prior to starting bradenhead mitigation, if a sample has not been collected within the last twelve months collect bradenhead and production gas samples for laboratory analysis. Sampling shall comply with Operator Guidance - Bradenhead Testing and Reporting Instructions, Appendix A: Liquid and Gas Sampling. Copies of all final laboratory analytical results shall be provided to the COGCC within three months of collecting the samples.
3. Operator shall implement measures to get an initial estimate of the gas flow rate and/or volume from the bradenhead. During the shut-in period record pressure data to adequately characterize the build-up.
4. This mitigation plan may be used for six consecutive months from the approved sundry date. At the conclusion of the six months (02/16/2021), conduct a new bradenhead test and submit the Form 17 within ten days of the test and submit a Form 4 Sundry that summarizes current well condition. The sundry should include details of the future plans and the flow rate information and pressure data. |
OGLA | Form: (04 ) 402695474 5/20/2021 | Operartor shall inspect the shoreline adjacent to the location daily for sheen and bubbles. Inspection shall be conducted prior to P&A operations, daily during the activity and for 10 days after activities have been completed. Operator will provide record of observations at the request of COGCC |
OGLA | Form: (04 ) 402695474 5/20/2021 | Operator shall contain and manage all fluids on portable secondary containment. Any spills or releases shall be reported to the COGCC Area EPS within 24 hours. |