|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 9/2/2021 Measured TD: 7765 ft. Vertical TD: 7465 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 9/2/2021 | Wellbore Permit | DIRECTIONAL | Permit #: | 20083246 | Expiration Date: | 5/15/2009 | Proposed Top PZ Location: | Sec:35 Twp: 3N 68W | Footage: 1341 FSL 2587 FWL | Bottom Hole Location: | Sec:35 Twp: 3N 68W | Footage: 1342 FSL 2594 FWL | Proposed Depth/Form: | 7769 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: GWA |
| | |
Wellbore Completed | Completion Date: | 5/26/2008 | Spud Date: | 5/22/2008 | Spud Date Is: | ACTUAL | Measured TD: | 7765 ft. | Measured PB depth: | 7720 ft. | True Vertical TD: | 7465 ft. | True Vertical PB depth: | 7420 ft. | Top PZ Location: | Sec:35 Twp: 3N 68W | Footage: 1341 FSL 2587 FWL | Bottom Hole Location: | Sec:35 Twp: 3N 68W | Footage: 1342 FSL 2594 FWL | Log Types: | CBL, P/E AILC-CNLD-ML | Log Types: | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 554 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 260, Top: 0 ft., Bottom: 554 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7754 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 628, Top: 3000 ft., Bottom: 7754 ft., Determination Method: CBL | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 1510 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 255, Top: 210 ft., Bottom: 1524 ft., Determination Method: CBL | Additional Cement: | String Type: 1ST , Top: 210 ft., Depth: 1510 ft., Bottom: 1524 ft., Sacks: 255, Method: 1 INCH | Formation | Interval Top | Log Bottom | Cored | DSTs | PARKMAN | 3718 ft. | 3930 ft. | N | N | SUSSEX | 4235 ft. | 4430 ft. | N | N | SHANNON | 4790 ft. | 4915 ft. | N | N | NIOBRARA | 7335 ft. | 7535 ft. | N | N | FORT HAYS | 7576 ft. | | N | N | CODELL | 7597 ft. | | N | N |
Formation CODL Formation Classification: GW Status: CM - 11/21/2008 Interval Top: 7598 ft. Interval Bottom: 7618 ft. Completed Information for Formation CODELL | 1st Production Date: | 10/23/2008 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 7/18/2008 | Treatment Summary: | 244,296 GALS FLUID & 200,060 LBS 40/70 SAND & 4000 LBS OF 20/40 SB EXCEL |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 7598 ft. | # Of Holes: | 60 | Interval Bottom: | 7618 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 9/7/2021 Interval Top: 7348 ft. Interval Bottom: 7618 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 10/23/2008 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 5/26/2008 | Treatment Summary: | |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BTU_GAS | 1252 | CALC_BBLS_H2O | 0 | CALC_BBLS_OIL | 63 | CALC_GOR | 2889 | CALC_MCF_GAS | 182 | CASING_PRESS | 1050 | GRAVITY_OIL | 51 |
| Perforation Data: | Interval Top: | 7348 ft. | # Of Holes: | 120 | Interval Bottom: | 7618 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 11/21/2008 Interval Top: 7348 ft. Interval Bottom: 7477 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 10/23/2008 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 7/21/2008 | Treatment Summary: | 248,970 GALS FLUID & 200,060 LBS 40/70 SAND & 4000 LBS 20/40 SB EXCEL |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 7348 ft. | # Of Holes: | 60 | Interval Bottom: | 7477 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
Reported Plugged | Y | 09/07/2021 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|