Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-123-24201SLEEP INN
E5
EXTRACTION OIL & GAS INC
10459
PA
9/11/2018
WATTENBERG
90750
GREELEY/WELD  123
NENE 20 5N65W 6
332837View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (06)
401347658
07/31/2017
1) Prior to starting plugging operations a Bradenhead test shall be performed. If the beginning pressure is greater than 25 psi, or if pressure remains at the conclusion of the test, or if any liquids were present contact COGCC Engineering for sampling requirements. The Form 17 shall be submitted within 10 days of the test.
EngineerForm: (06)
401347658
07/31/2017
1) Provide 48 hour notice of plugging MIRU via electronic Form 42. 2) For the 629’ plug: pump plug and displace. If surface casing plug is not circulated to surface then tag plug – must be at 429’ or shallower and provide 10 sx plug at the surface. Leave at least 100’ of cement in the casing for each plug. 3) Properly abandon flowlines as per Rule 1103. File electronic Form 42 once abandonment complete.
 
COGIS - Best Management Practice Results
No records to display.