|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 3/2/2018 Measured TD: 7840 ft. Vertical TD: 7276 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 3/2/2018 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20064183 | Expiration Date: | 8/28/2007 | | Proposed Top PZ Location: | Sec:20 Twp: 5N 65W | Footage: 1957 2085 | | Bottom Hole Location: | Sec:20 Twp: 5N 65W | Footage: 1957 2085 | | Proposed Depth/Form: | 7999 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-87 , Unit Acreage: 160, Drill Unit: NW/4 |
| | |
| Wellbore Completed | | Completion Date: | 4/11/2007 | | Spud Date: | 4/4/2007 | Spud Date Is: | ACTUAL | | Measured TD: | 7840 ft. | Measured PB depth: | 7758 ft. | | True Vertical TD: | 7276 ft. | True Vertical PB depth: | 7194 ft. | | Top PZ Location: | Sec:20 Twp: 5N 65W | Footage: 1957 FNL 2085 FWL | | Bottom Hole Location: | Sec:20 Twp: 5N 65W | Footage: 1957 FNL 2085 FWL | | Log Types: | CBL, DIL, CNL, CDL | | Casing: | String Type: SURF, Hole Size: 13.75 in., Size: 9.625 in., Top: 0 ft., Depth: 479 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 440, Top: 0 ft., Bottom: 479 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 7823 ft., Weight: 13.5 , Citings Type: ACTUAL | | Cement: | Sacks: 765, Top: 3016 ft., Bottom: 7823 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PARKMAN | 3905 ft. | 3993 ft. | N | N | | SUSSEX | 4712 ft. | 4775 ft. | N | N | | NIOBRARA | 7307 ft. | 7618 ft. | N | N | | FORT HAYS | 7618 ft. | 7640 ft. | N | N | | CODELL | 7640 ft. | 7660 ft. | N | N |
Formation CODL Formation Classification: GW Status: CM - 7/21/2007 Interval Top: 7642 ft. Interval Bottom: 7652 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 6/27/2007 | Choke Size: | 0.156 in. | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/2/2007 | | Treatment Summary: | 133,582 GAL FLUID, 240,261# 30/50 SAND |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7314 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 7/21/2007 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 32 | | BTU_GAS | 1221 | | CALC_BBLS_OIL | 32 | | CALC_GOR | 8687 | | CALC_MCF_GAS | 278 | | CASING_PRESS | 1600 | | GRAVITY_OIL | 58 | | MCF_GAS | 278 |
| | Perforation Data: | | Interval Top: | 7642 ft. | # Of Holes: | 40 | | Interval Bottom: | 7652 ft. | Hole Size: | 0.42 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 9/11/2018 Interval Top: 7328 ft. Interval Bottom: 7652 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 6/27/2007 | Choke Size: | 0.156 in. | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/2/2007 | | Treatment Summary: | |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7314 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 7/21/2007 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 32 | | BTU_GAS | 1221 | | CALC_BBLS_OIL | 32 | | CALC_GOR | 8687 | | CALC_MCF_GAS | 278 | | CASING_PRESS | 1600 | | GRAVITY_OIL | 58 | | MCF_GAS | 278 |
| | Perforation Data: | | Interval Top: | 7328 ft. | # Of Holes: | 112 | | Interval Bottom: | 7652 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: GW Status: CM - 7/21/2007 Interval Top: 7328 ft. Interval Bottom: 7474 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 6/27/2007 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 6/7/2007 | | Treatment Summary: | 174,532 GAL FLUID, 240,000# 30/50 SAND, 12,000# 12/20 SAND |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7328 ft. | # Of Holes: | 72 | | Interval Bottom: | 7474 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 09/11/2018 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|