| Engineer | Form: (04) 401476971 03/23/2018 | • This approval is good for one year and a new application must be made before December 5, 2018(1 year from prior application). Updates for the planned utilization of the well should be included with the application.
• A Form 5A is required to report all plugs currently downhole which isolate the perforated interval.
• The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request.
|
| Engineer | Form: (04) 402694875 04/29/2022 | Effective April 30, 2022 this well will be designated inactive and must be properly returned to production, plugged and abandoned, have an approved Form 5B or added to a Form 6A list no later than November 1, 2022. |