Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-23718
Well Classification: GW Status: TA - 4/14/2021
Well Name/No:GREEN XX #8-4
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:TAStatus Date4/14/2021
FacilityID:283948LocationID:305939
County:WELD #123Location:NWNW 8 1N65W 6
Field:WATTENBERG - #90750Elevation:4977 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:560FNL  660 FWLLat/Long: 40.071737 / -104.694917Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.071737 / -104.694917Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: TA - 4/14/2021             Measured TD: 8137 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        TA - 4/14/2021
Wellbore Permit
Permit #: Expiration Date:12/7/2017
Proposed Depth/Form:8123 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407-87 , Unit Acreage: 80, Drill Unit: W/2NW/4
Formation And Spacing:Code: DKTA , Formation: DAKOTA , Order: 499 , Unit Acreage: 320, Drill Unit: N2
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 320, Drill Unit: N2
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 80, Drill Unit: W/2NW/4
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1072 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 670, Top: 0 ft., Bottom: 1072 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8123 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 640, Top: 3585 ft., Bottom: 8137 ft.

Wellbore Completed
Completion Date:8/30/2006
Spud Date:8/25/2006Spud Date Is:ACTUAL
Measured TD:8137 ft.Measured PB depth:8106 ft.
True Vertical TD:True Vertical PB depth:
Log Types:GR/CCL/CBL, CDL/CNL/ML, DIL/GR
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1072 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 670, Top: 0 ft., Bottom: 1072 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8123 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 640, Top: 3585 ft., Bottom: 8137 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: , Weight: , Citings Type: ACTUAL
Cement:Sacks: 300, Top: , Bottom: , Determination Method:
Casing:String Type: 2ND, Hole Size: , Size: , Top: , Depth: , Weight: , Citings Type: ACTUAL
Cement:Sacks: 80, Top: , Bottom: , Determination Method:
Casing:String Type: 3RD, Hole Size: , Size: , Top: , Depth: , Weight: , Citings Type: ACTUAL
Cement:Sacks: 260, Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
PARKMAN3740 ft.NN
SUSSEX4652 ft.NN
NIOBRARA7024 ft.NN
FORT HAYS7348 ft.NN
CODELL7371 ft.NN
J SAND7798 ft.NN

Formation JSND                     Formation Classification:  GW                     Status:  TA - 4/14/2021                 Interval Top: 7814 ft.    Interval Bottom: 7832 ft.

 Completed Information for Formation J SAND
1st Production Date:11/20/2006Choke Size: 
Formation Name:J SANDCommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:11/20/2006
Treatment Summary:FRAC'D JSND W/ 7644 GALS OF LINEAR GEL & 67,116 GAL OF SILVERSTIM 24# GEL LOADING & 210,213#'S 20/40 OTTAWA SAND & 12,000#'S OF AC-FRAC CR 16/30 MESH PROPPANT.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 12
BBLS_OIL 7
BTU_GAS 1185
CALC_GOR 24285
CASING_PRESS 700
GRAVITY_OIL 62
MCF_GAS 170
TUBING_PRESS 300
Perforation Data:
Interval Top:7814 ft.# Of Holes:56
Interval Bottom:7832 ft.Hole Size:0.42 in.

Formation NBFHC                   Formation Classification:  GW                   Status:  CM - 8/1/2016                  Interval Top: 7032 ft.    Interval Bottom: 7381 ft.

 Completed Information for Formation NIOBRARA-FT HAYS-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARA-FT HAYS-CODELLCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:
Treatment Date:8/1/2016Treatment End Date:N/A
Treatment Summary:PERF CODL 7379-7381 PERF FT HAYES 7350-7352 PERF NBRR 7289-7291, 7249-7251, 7229-7231, 7201-7203, 7169-7171, 7139-7141, 7117-7119, 7032-7034
Total fluid used in treatment (bbls):20Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:10
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):20Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NBFHC.
Perforation Data:
Interval Top:7032 ft.# Of Holes:60
Interval Bottom:7381 ft.Hole Size:0.38 in.
Primary Well Designation:
Out Of Service      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (TA )YDefined Inactive
02/28/2015
Low ProducingYProduction Period
12/2024 - 11/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No