Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-123-22686CECIL FARMS
6-11
NOBLE ENERGY INC
100322
PA
10/10/2016
WATTENBERG
90750
SEVERANCE/WELD  123
NENE 6 6N66W 6
305232View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (06)
401024208
04/29/2016
1) Submit Form 42 electronically to COGCC 48 hours prior to MIRU. 2) For 1000’ plug: pump plug and displace. Annular cement must be circulated to surface. If production casing cement is not circulated to surface, shut-in, WOC 4 hours and tag plug – must be 770’ or shallower and provide minimum 10 sx plug inside and outside at the surface. Leave at least 100’ of cement in the wellbore for each plug. 3) Properly abandon flowlines. Once flowlines are properly abandoned, file electronic form 42.
 
COGIS - Best Management Practice Results
No records to display.