Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-22686
Well Classification: OW Status: PA - 10/10/2016
Well Name/No:CECIL FARMS #6-11
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:NOBLE ENERGY INC - 100322
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date10/10/2016
FacilityID:275816LocationID:305232
Municipality/County:SEVERANCE / WELD #123Location:NENE 6 6N66W 6
Field:WATTENBERG - #90750Elevation:4873 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:812FNL  817 FELLat/Long: 40.521353 / -104.815784Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.521401 / -104.815874Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 10/10/2016             Measured TD: 7511 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 10/10/2016
Wellbore Permit
Permit #:20050026 Expiration Date:2/1/2006
Proposed Depth/Form:7390 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-1 , Unit Acreage: 80, Drill Unit: E2NE

Wellbore Completed
Completion Date:2/24/2005
Spud Date:2/18/2005Spud Date Is:ACTUAL
Measured TD:7511 ft.Measured PB depth:7499 ft.
True Vertical TD:True Vertical PB depth:
Log Types:DIL, CDC, CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 820 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 575, Top: 12 ft., Bottom: 820 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 6691 ft., Depth: 7511 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 160, Top: 6420 ft., Bottom: 7511 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PARKMAN3734 ft.3972 ft.NN
SUSSEX4432 ft.4520 ft.NN
SHANNON4852 ft.4908 ft.NN
NIOBRARA7060 ft.7269 ft.NN
CODELL7328 ft.7348 ft.NN

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 10/10/2016                Interval Top: 7076 ft.    Interval Bottom: 7346 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:3/9/2005Choke Size:0.375 in.
Formation Name:NIOBRARA-CODELLCommingled:Yes
Production Method:FLOWING
Open Hole Completion:
Formation Treatment
Treatment Date:2/24/2005
Treatment Summary:FRAC CD/NB W/350,140# 20/40 SAND USING 103,071 GAL 26# SILVERSTIM.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/14/2005Test Method:FLOWING
Hours Tested:23Gas Type:SHALE
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 3
BBLS_OIL 66
CASING_PRESS 340
GRAVITY_OIL 2409
MCF_GAS 159
Perforation Data:
Interval Top:7076 ft.# Of Holes:172
Interval Bottom:7346 ft.Hole Size:3.125 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY10/10/2016
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No