COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
PermitForm: (06)
402082343
06/21/2019
Reported "as drilled" GPS data is inaccurate. Submit accurate "as drilled" GPS data on Subsequent Report of Abandonment. GPS data must meet the requirements of Rule 215.
PermitForm: (06)
402082343
06/25/2019
Submit a form 5A to report the bridge plugs identified on the zones tab and wellbore diagram attached to the Notice of Intent. Include wireline tickets. This Form 5A must be submitted within 30 days for compliance with Rule 308B.
EngineerForm: (06)
402082343
07/22/2019
Venting Operator shall implement measures to control unnecessary and excessive venting, to protect the health and safety of the public, and to ensure that vapors and odors from well plugging operations do not constitute a nuisance or hazard to public welfare.
EngineerForm: (06)
402082343
07/22/2019
Plugging 1) Provide 48 hour notice of plugging MIRU via electronic Form 42. 2) Properly abandon flowlines as per Rule 1105. File electronic Form 42 once abandonment complete. Within 30 days of an operator completing abandonment requirements for an off-location flowline or crude oil transfer line the operator must submit a Flowline Report, Form 44. 3) Plugs and squeezes will be placed as stated in the Plugging Procedure section of the approved NOIA unless revised by COA or prior approval from COGCC is obtained. Confirm COAs have been met on the Form 6 SRA 4) The wellbore must be static prior to placing cement plugs which are to be a minimum of 100' in length for all but surface plugs. Mechanical isolation requires a 25' cement plug, minimum. 5) Place a 50' plug (minimum) at the surface, both inside the inner most casing and in all annular spaces. Confirm cement to surface in all strings during cut and cap. 6) Contact area inspector prior to commencing plugging operations. 7) Add Sussex isolation at 4350-4150’, 20 sx casing plug or CIBP with 2 sx of cement. 8) Submit gyro survey with Form 6 SRA if available. 9) Correct Form 7 reporting prior to passing the Form 6 SRA.
EngineerForm: (06)
402082343
07/22/2019
Bradenhead Testing Prior to starting plugging operations a bradenhead test shall be performed if there has not been a reported bradenhead test within the 60 days immediately preceding the start of plugging operations. 1) If, before opening the bradenhead valve, the beginning pressure is greater than 25 psi, sampling is required. 2) If pressure remains at the conclusion of the test, or if any liquids were present during the test, sampling is required. The Form 17 shall be submitted within 10 days of the test. Sampling shall comply with Operator Guidance - Bradenhead Testing and Reporting Instructions. If samples are collected, copies of all final laboratory analytical results shall be provided to the COGCC within three (3) months of collecting the samples. If there is a need for sampling, contact COGCC engineering for verification of plugging procedure.
 