|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 7/30/2019 Measured TD: 8095 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 7/30/2019 | | Wellbore Permit | DRIFTED | | Permit #: | 010336 | Expiration Date: | 2/22/2002 | | Proposed Depth/Form: | 8075 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 318-A, 232, Unit Acreage: 320, Drill Unit: N2 |
| | |
| Wellbore Completed | | Completion Date: | 5/17/2001 | | Spud Date: | 4/4/2001 | Spud Date Is: | ACTUAL | | Measured TD: | 8095 ft. | Measured PB depth: | 8067 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | DUAL INDUCTION.GARD LOG GR: COMPENSATED DENSITY, COMPENSATED NEUTRON GR: GR CBL VDL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 622 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 435, Top: 0 ft., Bottom: 622 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8083 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 215, Top: 6800 ft., Bottom: 8083 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5150 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 300, Top: 3800 ft., Bottom: 5150 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4309 ft. | | N | N | | SHANNON | 4865 ft. | | N | N | | NIOBRARA | 7217 ft. | | N | N | | FORT HAYS | 7455 ft. | | N | N | | CODELL | 7477 ft. | | N | N | | CARLILE | 7493 ft. | | N | N | | BENTONITE | 7515 ft. | | N | N | | GREENHORN | 7515 ft. | | N | N | | GRANEROS | 7735 ft. | | N | N | | MOWRY | 7883 ft. | | N | N | | J-2 SAND | 7898 ft. | | N | N | | UNKNOWN | 7916 ft. | | N | N | | SKULL CREEK | 7999 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 7/30/2019 Interval Top: 7898 ft. Interval Bottom: 7948 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 5/17/2001 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/17/2001 | | Treatment Summary: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 24 | | BBLS_OIL | 7 | | CALC_BBLS_H2O | 24 | | CALC_BBLS_OIL | 7 | | CALC_GOR | 95143 | | CALC_MCF_GAS | 666 | | CASING_PRESS | 475 | | MCF_GAS | 666 | | TUBING_PRESS | 260 |
| | Perforation Data: | | Interval Top: | 7898 ft. | # Of Holes: | 80 | | Interval Bottom: | 7948 ft. | Hole Size: | 0.375 in. |
|
Formation CODL Formation Classification: GW Status: CM - 2/1/2011 Interval Top: 7480 ft. Interval Bottom: 7492 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 11/13/2002 | Choke Size: | | | Formation Name: | CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/17/2001 | | Treatment Summary: | SEE SCANNED DOC #1098811 |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 11/20/2002 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 20 | | BBLS_OIL | 30 | | CALC_BBLS_H2O | 20 | | CALC_BBLS_OIL | 30 | | CALC_GOR | 3700 | | CALC_MCF_GAS | 112 | | MCF_GAS | 112 | | TUBING_PRESS | 240 |
| | Perforation Data: | | Interval Top: | 7480 ft. | # Of Holes: | 48 | | Interval Bottom: | 7492 ft. | Hole Size: | 0.38 in. |
|
Formation J-CDL Formation Classification: GW Status: CM - 1/13/2003 Interval Top: 7480 ft. Interval Bottom: 7920 ft.| Completed Information for Formation J-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-CODELL | Commingled: | Yes | | Production Method: | FLOWING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/17/2001 | | Treatment Summary: | SEE SCANNED DOC# 1197087 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7885 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 1/21/2003 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 14 | | BBLS_OIL | 27 | | CALC_BBLS_H2O | 14 | | CALC_BBLS_OIL | 27 | | CALC_GOR | 17556 | | CALC_MCF_GAS | 474 | | CASING_PRESS | 550 | | MCF_GAS | 474 |
| | Perforation Data: | | Interval Top: | 7480 ft. | # Of Holes: | 136 | | Interval Bottom: | 7920 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 7/30/2019 Interval Top: 7260 ft. Interval Bottom: 7492 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 5/18/2010 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/20/2010 | | Treatment Summary: | NIOBRARA - PERFED THE NIOBRARA @ 7260-7278' W/4 SPF, 48 HOLES (03/16/2010). FRAC'D WITH 134,946 GAL FRAC FLUID CONTAINING 251,120 # SAND. CODELL - FRAC'D WITH 116,298 GAL FRAC FLUID CONTAINING 250,560 # SAND. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 13 | | BBLS_OIL | 10 | | BTU_GAS | 1252 | | CALC_BBLS_H2O | 40 | | CALC_BBLS_OIL | 80 | | CALC_GOR | 3625 | | CALC_MCF_GAS | 290 | | CASING_PRESS | 1007 | | GRAVITY_OIL | 48 | | MCF_GAS | 46 | | TUBING_PRESS | 126 |
| | Perforation Data: | | Interval Top: | 7260 ft. | # Of Holes: | 96 | | Interval Bottom: | 7492 ft. | Hole Size: | |
|
Formation SNSD Formation Classification: GW Status: AB - 6/9/2010 Interval Top: 4870 ft. Interval Bottom: 4888 ft.| Completed Information for Formation SHANNON | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | SHANNON | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 3/12/2010 | | Treatment Summary: | SQUEEZED THE SHANNON FORMATION W/150 SX PREMIUM "G'" CEMENT @ 15.8 #, 1.15 YIELD. | | Formation Treatment | | Treatment Date: | 5/17/2001 | | Treatment Summary: | SET CIBP @ 5000'. PERF'D THE SHANNON F/ 4870-4888' W/ 4 SPF. FRAC'D W/ 298,000# 20/40 FRAC SAND. RIH W/ BAILER AND TBG. TAG SAND @ 4888'. POOH. RIH W/ PROD TBG. LAND TBG |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 29 | | BBLS_OIL | 3 | | CALC_BBLS_H2O | 29 | | CALC_BBLS_OIL | 3 | | CALC_GOR | 2333 | | CALC_MCF_GAS | 7 | | CASING_PRESS | 195 | | MCF_GAS | 7 | | TUBING_PRESS | 185 |
| | Perforation Data: | | Interval Top: | 4870 ft. | # Of Holes: | 72 | | Interval Bottom: | 4888 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 07/30/2019 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|