| Engineer | Form: (04) 401421831 10/11/2017 | 1) Prior to starting repair work a bradenhead test shall be performed. If the beginning pressure is greater than 25 psi, or if pressure remains at the conclusion of the test, or if any liquids were present contact COGCC Engineer for sampling requirements before pumping any cement. The Form 17 shall be submitted within 10 days of the test.
2) The additional cement specified shall be placed as indicated in accordance with 317.j. The placed cement shall be verified with a CBL and documented with a Form 5 SR. |