Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-20188
Well Classification: GW Status: SI - 12/1/2021
Well Name/No:LUHMAN #44-4
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date12/1/2021
FacilityID:258687LocationID:331118
County:WELD #123Location:SESE 4 2N67W 6
Field:WATTENBERG - #90750Elevation:4930 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:462FSL  460 FELLat/Long: 40.161127 / -104.887643Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.161209 / -104.887496Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 12/1/2021             Measured TD: 8100 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 12/1/2021
Wellbore Permit
Permit #:Expiration Date:10/15/2002
Proposed Depth/Form:8100 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407, 407-6, Unit Acreage: 80, Drill Unit: E2SE/4
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 232 , Unit Acreage: 315, Drill Unit: S2

Wellbore Completed
Completion Date:3/7/2001
Spud Date:2/2/2001Spud Date Is:ACTUAL
Measured TD:8100 ft.Measured PB depth:8083 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CONPENSATED DENSITY,COMPENSATED NEUTRON GR;DUAL INDUCTIN GUARD LOG GR; CBL GR VDL
Log Types:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 614 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 430, Top: 0 ft., Bottom: 614 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8092 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 265, Top: 6620 ft., Bottom: 8092 ft., Determination Method: CBL
Additional Cement:String Type: 1ST , Top: 4106 ft., Depth: 4285 ft., Bottom: 4285 ft., Sacks: 100, Method: SQUEEZE
FormationInterval TopLog BottomCoredDSTs
SUSSEX4385 ft.NN
SHANNON4915 ft.NN
NIOBRARA7231 ft.NN
FORT HAYS7472 ft.NN
CODELL7494 ft.NN
CARLILE7516 ft.NN
GREENHORN7540 ft.NN
GRANEROS7763 ft.NN
BENTONITE7763 ft.NN
MOWRY7914 ft.NN
J-2 SAND7928 ft.NN
SKULL CREEK8040 ft.NN

Formation JSND                     Formation Classification:  GW                     Status:  SI - 12/1/2021                 Interval Top: 7932 ft.    Interval Bottom: 7992 ft.

 Completed Information for Formation J SAND
1st Production Date:N/AChoke Size: 
Formation Name:J SANDCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:11/29/2009
Treatment Summary:DRILLED OUT CBP @ 7850'
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 33
BBLS_OIL 4
CALC_BBLS_H2O 33
CALC_BBLS_OIL 4
CALC_GOR 106500
CALC_MCF_GAS 426
CASING_PRESS 420
MCF_GAS 426
TUBING_PRESS 230
Perforation Data:
Interval Top:7932 ft.# Of Holes:120
Interval Bottom:7992 ft.Hole Size:

Formation CODL                     Formation Classification:  GW                     Status:  CM - 12/3/2009                 Interval Top: 7496 ft.    Interval Bottom: 7516 ft.

 Completed Information for Formation CODELL
1st Production Date:N/AChoke Size:0.219 in.
Formation Name:CODELLCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:3/7/2001
Treatment Summary:SET BRIDGE PLUG @ 7570'. PERF CODELL. FRAC W/ 300,000 # 20/40 FRAC SAND IN 128,000 GALS PHOENIX 22# AND 20#. FLOW BACK FRAC.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/15/2001Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 15
BBLS_OIL 35
CALC_BBLS_H2O 15
CALC_BBLS_OIL 35
CALC_GOR 3862
CALC_MCF_GAS 134
CASING_PRESS 180
MCF_GAS 134
Perforation Data:
Interval Top:7496 ft.# Of Holes:40
Interval Bottom:7516 ft.Hole Size:0.4 in.

Formation J-CDL                   Formation Classification:  GW                   Status:  CM - 12/3/2009                 Interval Top: 7496 ft.    Interval Bottom: 7992 ft.

 Completed Information for Formation J-CODELL
1st Production Date:N/AChoke Size:0.250 in.
Formation Name:J-CODELLCommingled:No
Production Method:PUMPING
Open Hole Completion:No
Formation Treatment
Treatment Date:3/7/2001
Treatment Summary:DRILL OUT CIBP. RIH W/PROD TBG. SWAB WELL BACK.
Tubing Size:2.375 in.Tubing Setting Depth:7922 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/22/2002Test Method:PUMPING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 13
BBLS_OIL 18
CALC_BBLS_H2O 13
CALC_BBLS_OIL 18
CALC_GOR 35917
CALC_MCF_GAS 647
CASING_PRESS 460
MCF_GAS 647
TUBING_PRESS 220
Perforation Data:
Interval Top:7496 ft.# Of Holes:140
Interval Bottom:7992 ft.Hole Size:

Formation JNBCD                   Formation Classification:  GW                   Status:  CM - 12/3/2009                 Interval Top: 7260 ft.    Interval Bottom: 7992 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/7/2001
Treatment Summary:JSND-NBRR-CDL COMMINGLE DRILLED OUT CFP @ 7400'. 11/24/09. DRILLED OUT CBP @ 7850' TO COMMINGLE THE JSND-NBRR-CDL. 11/29/09
Tubing Size:2.375 in.Tubing Setting Depth:7920 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/3/2009Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 10
BTU_GAS 1236
CALC_BBLS_H2O 0
CALC_BBLS_OIL 10
CALC_GOR 11400
CALC_MCF_GAS 38
CASING_PRESS 798
GRAVITY_OIL 52
MCF_GAS 38
TUBING_PRESS 427
Perforation Data:
Interval Top:7260 ft.# Of Holes:260
Interval Bottom:7992 ft.Hole Size:0.42 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  SI - 12/1/2021                 Interval Top: 7260 ft.    Interval Bottom: 7516 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARA-CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:11/15/2009
Treatment Summary:NBRR-CDL REFRAC SET CBP @ 7850'. 11-13-09. RE-FRAC'D THE CODELL WITH 251,060 20/40 SAND IN 81,396 GALS VISTAR 26/24 XLF. SAND PUMPED FROM 1# TO 5#. TOTAL GELLED FLUID. 115,542 GALS. TOTAL FRAC FLUID 119,490. 11/15/09. SET CFP @ 7400'. 11/17/09. RE-FRAC
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:7260 ft.# Of Holes:160
Interval Bottom:7516 ft.Hole Size:0.42 in.
Primary Well Designation:
Out Of Service      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2030
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (SI)YLast Production
11/30/2021
Low ProducingYProduction Period
01/2025 - 12/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No