| Engineer | Form: (02) 2286896 01/30/2012 | Prior to recomplete, operator must: 1) Verify existing cement with a cement bond log.
2) If it is not present as follows, provide remedial cement 200’ above Niobrara (minimum cement top of 6760’. Verify remedial cement coverage with cement bond log. |
| Engineer | Form: (06) 400603502 05/08/2014 | Note changes to plugging procedure:
1) Provide 48 hour notice of plugging MIRU via electronic Form 42.
2) For 910’ plug: pump plug and displace, shut-in, WOC 4 hours and tag plug – must be 317' or shallower, shoe plug must circulate to surface, if not circulated to surface, WOC 4 hours and tag plug. Leave at least 100’ of cement in the casing for each plug.
3) Properly abandon flowlines as per Rule 1103. File electronic Form 42 once abandonment complete.
|