|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 6/18/2014 Measured TD: 7870 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 6/18/2014 | | Wellbore Permit | | | Permit #: | | Expiration Date: | 2/14/2014 | | Proposed Depth/Form: | 7870 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: , Unit Acreage: 320, Drill Unit: N/2 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 407-66 , Unit Acreage: 320, Drill Unit: N/2 | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407 , Unit Acreage: 320, Drill Unit: N/2 |
| | |
| Wellbore Completed | | Completion Date: | 1/4/1981 | | Spud Date: | 8/6/1980 | Spud Date Is: | ACTUAL | | Measured TD: | 7870 ft. | Measured PB depth: | 7830 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | SP-IES, FDC-GR CAL, CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 417 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 325, Top: 0 ft., Bottom: 417 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7870 ft., Weight: 10.5/11.6, Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: 6988 ft., Bottom: 7870 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4085 ft. | 4193 ft. | N | N | | SHANNON | 4530 ft. | 4575 ft. | N | N | | NIOBRARA | 6960 ft. | 7186 ft. | N | N | | CODELL | 7252 ft. | 7274 ft. | N | N | | BENTONITE | 7510 ft. | | N | N | | J SAND | 7690 ft. | 7728 ft. | N | N |
Formation JSND Formation Classification: OW Status: AB - 11/12/2014 Interval Top: 7698 ft. Interval Bottom: 7728 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 12/17/1980 | Choke Size: | | | Formation Name: | J SAND | Commingled: | | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 1/4/1981 | | Treatment Summary: | 500 GAL 7.5% SHA ACD. XLINK FRAC DN CSG X 18520 GAL COND X 167916 WTR. 807500# 20/40 SN FLX 5040 WTR. DIVERTAFRAC: PUMPED 72 BBLS FO POLYMER GEL WITH 211 BBLS OF GEL WITH 4500# 20/40 SN. FLUSH W. 107 BBLS OF GEL. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7972 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 1/4/1981 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 25 | | BBLS_OIL | 3 | | CALC_BBLS_H2O | 25 | | CALC_BBLS_OIL | 3 | | CALC_GOR | 123333 | | CALC_MCF_GAS | 370 | | GRAVITY_OIL | 54.6 | | MCF_GAS | 370 |
| | Perforation Data: | | Interval Top: | 7698 ft. | # Of Holes: | | | Interval Bottom: | 7728 ft. | Hole Size: | 0.38 in. |
|
Formation CODL Formation Classification: OW Status: AB - 11/12/2014 Interval Top: 7519 ft. Interval Bottom: 7542 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 8/3/1995 | Choke Size: | 0.594 in. | | Formation Name: | CODELL | Commingled: | | | Production Method: | PLUNGER | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 1/4/1981 | | Treatment Summary: | PUMPED 477 BBLS OF GEL W. 1203 BBLS FO GEL WITH 250000# 20/40 SAND. FLUSHED WITH 33 BBLS OF 2% KCL. MAX PSI: 6600, MAX RATE 16.3 // 262,700 20/40 MESH 88746 GAL GELLED FLUID PERF CODL 7253-7262 |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7227 ft. | | Tubing Packer Depth: | 7440 ft. | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 2/14/2003 | Test Method: | PLUNGER | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | BBLS_OIL | 11 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 11 | | CALC_GOR | 3273 | | CALC_MCF_GAS | 36 | | CASING_PRESS | 510 | | GRAVITY_OIL | 60 | | MCF_GAS | 36 | | TUBING_PRESS | 380 |
| | Perforation Data: | | Interval Top: | 7519 ft. | # Of Holes: | | | Interval Bottom: | 7542 ft. | Hole Size: | |
|
Formation J-CDL Formation Classification: OW Status: CM - 6/18/2014 Interval Top: 7519 ft. Interval Bottom: 7728 ft.| Completed Information for Formation J-CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J-CODELL | Commingled: | Yes | | Production Method: | PLUNGER | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 1/4/1981 | | Treatment Summary: | COMMINGLED J-CDL |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7688 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/21/2003 | Test Method: | PLUNGER | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | BBLS_OIL | 4 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 4 | | CALC_GOR | 13500 | | CALC_MCF_GAS | 54 | | CASING_PRESS | 440 | | GRAVITY_OIL | 60 | | MCF_GAS | 54 | | TUBING_PRESS | 300 |
| | Perforation Data: | | Interval Top: | 7519 ft. | # Of Holes: | | | Interval Bottom: | 7728 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 06/18/2014 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|