Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-123-099711415 CORPORATION GU "D"
2
KERR MCGEE OIL & GAS ONSHORE LP
47120
PA
12/1/2017
WATTENBERG
90750
WELD  123
SENW 25 2N67W 6
318798View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
AgencyForm: (02)
1698346
05/14/2010
1) Provide 24 hour notice of MIRU to Jim Precup at 303-469-1902 or e-mail at james.precup@state.co.us. 2) No CBL on file. Run CBL to verify cement coverage to at least 200' above Niobrara. 3) Comply with Rule 317.p - Provide remedial cement as needed: TD - 7020’ (Niobrara), 4850’ – 4250’ (Sussex), and 680’ - 214 (Fox Hills aquifer). Verify coverage with cement bond log. Note: No information on record that cement was pumped thru DV tool at 640’.
AgencyForm: (02)
1698346
05/14/2010
1) Provide 24 hour notice of MIRU to Jim Precup at 303-469-1902 or e-mail at james.precup@state.co.us. 2) No CBL on file. Run CBL to verify cement coverage to at least 200' above Niobrara. 3) Comply with Rule 317.p - Provide remedial cement as needed: TD - 7020’ (Niobrara), 4850’ – 4250’ (Sussex), and 680’ to 50’ above surface casing shoe (Fox Hills aquifer). Verify coverage with cement bond log. Note: No information on record that cement was pumped thru DV tool at 640’.
EngineerForm: (06)
401306029
09/26/2017
Prior to starting plugging operations a bradenhead test shall be performed. 1) If, before opening the bradenhead valve, the beginning pressure is greater than 25 psi, sampling is required. 2) If pressure remains at the conclusion of the test, or if any liquids were present during the test, sampling is required. Sampling shall comply with Operator Guidance - Bradenhead Testing and Reporting Instructions. The Form 17 shall be submitted within 10 days of the test.
EngineerForm: (06)
401306029
09/26/2017
1) Provide 48 hour notice of plugging MIRU via electronic Form 42. 2) Properly abandon flowlines as per Rule 1103. 3) Leave at least 100’ of cement in the wellbore for each plug. 4) Please submit gyro survey data with Form 6 Subsequent Report of Abandonment.
 
COGIS - Best Management Practice Results
No records to display.