|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 12/1/2017 Measured TD: 8115 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 12/1/2017 | | Wellbore Permit | | | Permit #: | | Expiration Date: | 6/1/2012 | | Proposed Depth/Form: | 8115 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 320, Drill Unit: | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: NW/4 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 264 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 175, Top: 0 ft., Bottom: 264 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8115 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 200, Top: 6965 ft., Bottom: 8115 ft. | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 640 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 190, Top: 264 ft., Bottom: 640 ft. |
| | |
| Wellbore Completed | | Completion Date: | 6/14/1980 | | Spud Date: | 5/31/1980 | Spud Date Is: | ACTUAL | | Measured TD: | 8115 ft. | Measured PB depth: | 8060 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | SP-IES, FDC-GR CALIPER | | Log Types: | CBL-GR-CCL run 7/26/10 for SUSX squeeze | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 264 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 175, Top: 0 ft., Bottom: 264 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8115 ft., Weight: 10.5/11.6, Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: 7306 ft., Bottom: 8115 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 7280 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 250, Top: 6646 ft., Bottom: 7280 ft., Determination Method: CBL | | Casing: | String Type: S.C. 2.2, Hole Size: , Size: , Top: , Depth: 4460 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 80, Top: 4328 ft., Bottom: 4462 ft., Determination Method: CBL | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 592 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 190, Top: 264 ft., Bottom: 638 ft., Determination Method: CBL | | Additional Cement: | String Type: 1ST , Top: 264 ft., Depth: 640 ft., Bottom: 640 ft., Sacks: 190, Method: STAGE TOOL | | Additional Cement: | String Type: S.C. 1.1 , Top: 4350 ft., Depth: 4460 ft., Bottom: 4450 ft., Sacks: 80, Method: SQUEEZE | | Additional Cement: | String Type: S.C. 1.2 , Top: 4450 ft., Depth: 4460 ft., Bottom: 4490 ft., Sacks: 25, Method: SQUEEZE | | Additional Cement: | String Type: S.C. 2.1 , Top: 6520 ft., Depth: 7280 ft., Bottom: 7280 ft., Sacks: 250, Method: SQUEEZE | | Formation | Interval Top | Log Bottom | Cored | DSTs | | FOX HILLS BASE | 590 ft. | | N | N | | SUSSEX | 4390 ft. | | | | | SHANNON | 5032 ft. | | | | | NIOBRARA | 7224 ft. | | | | | CODELL | 7515 ft. | | | | | BENTONITE | 7784 ft. | | N | N | | J SAND | 7950 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 12/1/2017 Interval Top: 7970 ft. Interval Bottom: 8000 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 9/25/1980 | Choke Size: | | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/28/2011 | | Treatment Summary: | REMOVED SAND PLUG SET @ 7968. HOLE SIZE N/A. | | Formation Treatment | | Treatment Date: | 7/7/2010 | | Treatment Summary: | Set sand plug @ 7768'. | | Formation Treatment | | Treatment Date: | 10/21/1980 | | Treatment Summary: | SPEARHEAD - 500 GALS 7.5% BDA ACID - WT FRAC X 13,000 GALS COND X 12,000 GALS WATER - 42,000# 20-40 SN FLUSH X 5,460 GALS WT |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 5 | | BBLS_OIL | 5 | | CALC_BBLS_H2O | 5 | | CALC_BBLS_OIL | 5 | | CALC_GOR | 224000 | | CALC_MCF_GAS | 1120 | | GRAVITY_OIL | 52.7 | | MCF_GAS | 1120 |
| | Perforation Data: | | Interval Top: | 7970 ft. | # Of Holes: | 120 | | Interval Bottom: | 8000 ft. | Hole Size: | 0.375 in. |
|
Formation JNBCD Formation Classification: GW Status: CM - 5/12/2011 Interval Top: 7226 ft. Interval Bottom: 8000 ft.| Completed Information for Formation J-NIOBRARA-CODELL | | 1st Production Date: | 5/4/2011 | Choke Size: | | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 4/28/2011 | | Treatment Summary: | REMOVED SAND PLUG SET @ 7968. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/12/2011 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 1 | | BTU_GAS | 1328 | | CALC_BBLS_OIL | 1 | | CALC_GOR | 20000 | | CALC_MCF_GAS | 20 | | CASING_PRESS | 479 | | GRAVITY_OIL | 47 | | MCF_GAS | 20 |
| | Perforation Data: | | Interval Top: | 7226 ft. | # Of Holes: | 192 | | Interval Bottom: | 8000 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: OW Status: AB - 12/1/2017 Interval Top: 7226 ft. Interval Bottom: 7532 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 8/9/2010 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 7/29/2010 | | Treatment Summary: | NBRR Perf 7226-7424 Holes 32 Size 0.38 CODL Perf 7512-7532 Holes 40 Size 0.38
Frac NBRR w/ 250 gal 15% HCl & 178,208 gal Vistar Hybrid & 251,740# 20/40 sand & 4,280# SB Excel.
Frac CODL w/ 132,006 gal Vistar & 221,240# 20/40 sand & 4,080# SB Excel. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 8/18/2010 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 63 | | BTU_GAS | 1172 | | CALC_BBLS_OIL | 63 | | CALC_GOR | 4317 | | CALC_MCF_GAS | 272 | | CASING_PRESS | 150 | | GRAVITY_OIL | 46 | | MCF_GAS | 272 |
| | Perforation Data: | | Interval Top: | 7226 ft. | # Of Holes: | 72 | | Interval Bottom: | 7532 ft. | Hole Size: | 0.375 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 12/01/2017 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|