Engineer | Form: (04 ) 400551194 2/7/2014 | The additional cement referenced shall be placed as indicated and comply with Rule 317.i. The placed cement shall be verified with a CBL and documented with a Form 5 Drilling Completion Report. |
Engineer | Form: (06 ) 401099718 9/16/2016 | 1) Prior to starting plugging operations, a bradenhead test shall be performed. If any pressure remains at the conclusion of the test or any liquids were present contact COGCC Engineer for sampling requirements. The Form 17 shall be submitted within 10 days of the test.
2) Provide 48 hour notice of plugging MIRU via electronic Form 42.
3) Properly abandon flowlines as per Rule 1103. File electronic Form 42 once abandonment complete.
4) If plug at 1500' is not circulated to surface then tag plug – must be 150’ or shallower and provide 10 sack plug at the surface. Leave at least 100’ cement in the casing for each plug.
|