|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 11/3/2016 Measured TD: 8260 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 11/3/2016 | Wellbore Permit | DRIFTED | Permit #: | 19800545 | Expiration Date: | 6/7/1995 | Proposed Depth/Form: | 8250 ft. | Surface Mineral Owner Same: | Not available | Mineral Owner: | FEE | Surface Owner: | Not available | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-66 , Unit Acreage: 160, Drill Unit: SE4 | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 0 , Unit Acreage: 320, Drill Unit: S2 |
| | |
Wellbore Completed | Completion Date: | N/A | Spud Date: | 6/17/1980 | Spud Date Is: | ACTUAL | Measured TD: | 8260 ft. | Measured PB depth: | 8211 ft. | True Vertical TD: | | True Vertical PB depth: | | Log Types: | CBL | Log Types: | SP-IES, FDC-GR CALIPER | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 250 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 200, Top: 0 ft., Bottom: 250 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8258 ft., Weight: 10.5/11.6, Citings Type: ACTUAL | Cement: | Sacks: 200, Top: 7500 ft., Bottom: 8260 ft., Determination Method: CBL | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 702 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 250, Top: 0 ft., Bottom: 702 ft., Determination Method: CBL | Additional Cement: | String Type: 1ST , Top: 634 ft., Depth: 1111 ft., Bottom: 1111 ft., Sacks: 160, Method: SQUEEZE | Additional Cement: | String Type: 1ST , Top: 427 ft., Depth: 747 ft., Bottom: 747 ft., Sacks: 25, Method: | Additional Cement: | String Type: 1ST , Top: 975 ft., Depth: 1168 ft., Bottom: 1168 ft., Sacks: 30, Method: | Additional Cement: | String Type: 1ST , Top: 4372 ft., Depth: 4502 ft., Bottom: 4580 ft., Sacks: 150, Method: SQUEEZE | Additional Cement: | String Type: 1ST , Top: 4660 ft., Depth: 5002 ft., Bottom: 5005 ft., Sacks: 400, Method: SQUEEZE | Additional Cement: | String Type: 1ST , Top: 6826 ft., Depth: 7452 ft., Bottom: 7452 ft., Sacks: 180, Method: SQUEEZE | Additional Cement: | String Type: 1ST , Top: , Depth: 702 ft., Bottom: , Sacks: , Method: DV TOOL | Formation | Interval Top | Log Bottom | Cored | DSTs | FOX HILLS BASE | 640 ft. | | N | N | SUSSEX | 4710 ft. | | N | N | NIOBRARA | 7334 ft. | | N | N | BENTONITE | 7945 ft. | | N | N | J SAND | 8114 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 11/3/2016 Interval Top: 8126 ft. Interval Bottom: 8156 ft. Completed Information for Formation J SAND | 1st Production Date: | 1/15/1981 | Choke Size: | 0.750 in. | Formation Name: | J SAND | Commingled: | Yes | Production Method: | FLOWING | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 2/11/1981 | Treatment Summary: | VERSAGEL FRAC X 20286 GAL OIL X 181482 GAL WATER - 832000# 20/40 SN - FLUSH X 5544 GAL WATER |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8120 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 2/11/1981 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 5 | BBLS_OIL | 8 | CALC_GOR | 212500 | GRAVITY_OIL | 48.9 | MCF_GAS | 1700 |
| Perforation Data: | Interval Top: | 8126 ft. | # Of Holes: | | Interval Bottom: | 8156 ft. | Hole Size: | 0.38 in. |
|
Formation CODL Formation Classification: OW Status: AB - 11/3/2016 Interval Top: 7680 ft. Interval Bottom: 7700 ft. Completed Information for Formation CODELL | 1st Production Date: | 3/7/1995 | Choke Size: | 0.281 in. | Formation Name: | CODELL | Commingled: | Yes | Production Method: | FLOWING | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 2/11/1981 | Treatment Summary: | DIVERTAFRAC: PUMPED 72 BBLS OF POLYMER GEL AND 216 BBLS OF POLYMER GEL WITH 4,500 LBS OF 20/40 SAND. FLUSHED WITH 103 BBLS OF POLYMER GEL. CODELL FRAC: PUMPED 429 BBLS OF POLYMER GEL AND 795 BBLS OF POLYMER GEL WITH 135,160 LBS OF 20/40 SAND. FLUSHED WITH 31 BBLS OF 2% KCL. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 3/7/1995 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_OIL | 75 | CALC_GOR | 1000 | CASING_PRESS | 1676 | MCF_GAS | 75 | TUBING_PRESS | 1872 |
| Perforation Data: | Interval Top: | 7680 ft. | # Of Holes: | 81 | Interval Bottom: | 7700 ft. | Hole Size: | 0.38 in. |
|
Formation J-CDL Formation Classification: OW Status: CM - 11/3/2016 Interval Top: 7680 ft. Interval Bottom: 8156 ft. Completed Information for Formation J-CODELL | 1st Production Date: | 4/12/1995 | Choke Size: | | Formation Name: | J-CODELL | Commingled: | Yes | Production Method: | FLOWING | Open Hole Completion: | |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8145 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 4/12/1995 | Test Method: | FLOWING | Hours Tested: | 96 | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 128 | BBLS_OIL | 164 | CALC_BBLS_H2O | 32 | CALC_BBLS_OIL | 41 | CALC_GOR | 8683 | CALC_MCF_GAS | 356 | MCF_GAS | 1460 |
| Perforation Data: | Interval Top: | 7680 ft. | # Of Holes: | | Interval Bottom: | 8156 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
Reported Plugged | Y | 11/03/2016 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|