Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-123-09813BECKY
1
KP KAUFFMAN COMPANY INC
46290
SI
1/1/2025
SPINDLE
77900
WELD  123
NENW 6 1N68W 6
318719View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (04)
401325103
06/29/2017
1) Well has demonstrated lack of mechanical integrity and must be repaired or plugged and abandoned within six months. 2) The additional cement referenced shall be placed as indicated. The placed cement shall be verified with a CBL and documented with a Form 5. No CBL on file with COGCC- verify TOC with CBL and submit. 3) After repair conduct a Mechanical Integrity Test and submit results to COGCC on a Form 21.
 
COGIS - Best Management Practice Results
No records to display.