Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-09813
Well Classification: OW Status: SI - 1/1/2025
Well Name/No:BECKY #1
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KP KAUFFMAN COMPANY INC - 46290
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date1/1/2025
FacilityID:242022LocationID:318719
County:WELD #123Location:NENW 6 1N68W 6
Field:SPINDLE - #77900Elevation:4962 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:660FNL  1980 FWLLat/Long: 40.085747 / -105.048368Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.085660 / -105.048340Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: SI - 1/1/2025             Measured TD: 5010 ft.    Vertical TD: 5010 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        SI - 1/1/2025
Wellbore Permit
Permit #:19791160 Expiration Date:2/19/1980
Proposed Top PZ Location:Sec:6 Twp: 1N 68W Footage: 660 FNL  1980 FWL
Bottom Hole Location:Sec:6 Twp: 1N 68W Footage: 660 FNL  1980 FWL
Proposed Depth/Form:4980 ft.
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: SNSD , Formation: SHANNON , Order: , Unit Acreage: 40, Drill Unit: NENW

Wellbore Completed
Completion Date:2/4/1980
Spud Date:1/28/1980Spud Date Is:ACTUAL
Measured TD:5010 ft.Measured PB depth:4964 ft.
True Vertical TD:5010 ft.True Vertical PB depth:4964 ft.
Bottom Hole Location:Sec:6 Twp: 1N 68WFootage: 660 FNL  1980 FWL
Log Types:CBL
Log Types:IE, DENSITY-BC
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 586 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 425, Top: 0 ft., Bottom: 586 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 2500 ft., Depth: 5010 ft., Weight: 10.5 , Citings Type: ACTUAL
Cement:Sacks: 325, Top: 4528 ft., Bottom: 5010 ft., Determination Method: CBL
Additional Cement:String Type: 1ST , Top: 0 ft., Depth: 920 ft., Bottom: 1150 ft., Sacks: 250, Method: 1 INCH
FormationInterval TopLog BottomCoredDSTs
PARKMAN3885 ft.
SUSSEX4431 ft.
SHANNON4875 ft.4901 ft.NN

Formation SNSD                     Formation Classification:  OW                     Status:  SI - 12/1/2024                 Interval Top: 4875 ft.    Interval Bottom: 4901 ft.

 Completed Information for Formation SHANNON
1st Production Date:10/28/1980Choke Size:2.000 in.
Formation Name:SHANNONCommingled:
Production Method:PUMPING
Open Hole Completion:
Formation Treatment
Treatment Date:9/25/1980
Treatment Summary:FRAC W/ 104,000 GAL K-1 EMUL., 40,000# 100 M, 100,000# 20/40 M, & 156,000# 10/20 M
Tubing Size:2.375 in.Tubing Setting Depth:4880 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/3/1980Test Method:PUMPING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 3
BBLS_OIL 30
CALC_GOR 3333
CASING_PRESS 65
MCF_GAS 100
TUBING_PRESS 65
Perforation Data:
Interval Top:4875 ft.# Of Holes:27
Interval Bottom:4901 ft.Hole Size:
Primary Well Designation:
Defined Inactive      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (SI)YLast Production
11/30/2024
Low ProducingYProduction Period
02/2025 - 01/2026

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No