Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-09813
Well Classification: OW Status: SI - 1/1/2025
Well Name/No:BECKY #1
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KP KAUFFMAN COMPANY INC - 46290
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date1/1/2025
FacilityID:242022LocationID:318719
County:WELD #123Location:NENW 6 1N68W 6
Field:SPINDLE - #77900Elevation:4962 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:660FNL  1980 FWLLat/Long: 40.085747 / -105.048368Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.085660 / -105.048340Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: SI - 1/1/2025             Measured TD: 5010 ft.    Vertical TD: 5010 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        SI - 1/1/2025
Wellbore Permit
Permit #:19791160 Expiration Date:2/19/1980
Proposed Top PZ Location:Sec:6 Twp: 1N 68W Footage: 660 FNL  1980 FWL
Bottom Hole Location:Sec:6 Twp: 1N 68W Footage: 660 FNL  1980 FWL
Proposed Depth/Form:4980 ft.
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: SNSD , Formation: SHANNON , Order: , Unit Acreage: 40, Drill Unit: NENW

Wellbore Completed
Completion Date:2/4/1980
Spud Date:1/28/1980Spud Date Is:ACTUAL
Measured TD:5010 ft.Measured PB depth:4964 ft.
True Vertical TD:5010 ft.True Vertical PB depth:4964 ft.
Bottom Hole Location:Sec:6 Twp: 1N 68WFootage: 660 FNL  1980 FWL
Log Types:CBL
Log Types:IE, DENSITY-BC
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 586 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 425, Top: 0 ft., Bottom: 586 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 2500 ft., Depth: 5010 ft., Weight: 10.5 , Citings Type: ACTUAL
Cement:Sacks: 325, Top: 4528 ft., Bottom: 5010 ft., Determination Method: CBL
Additional Cement:String Type: 1ST , Top: 0 ft., Depth: 920 ft., Bottom: 1150 ft., Sacks: 250, Method: 1 INCH
FormationInterval TopLog BottomCoredDSTs
PARKMAN3885 ft.
SUSSEX4431 ft.
SHANNON4875 ft.4901 ft.NN

Formation SNSD                     Formation Classification:  OW                     Status:  SI - 12/1/2024                 Interval Top: 4875 ft.    Interval Bottom: 4901 ft.

 Completed Information for Formation SHANNON
1st Production Date:10/28/1980Choke Size:2.000 in.
Formation Name:SHANNONCommingled:
Production Method:PUMPING
Open Hole Completion:
Formation Treatment
Treatment Date:9/25/1980
Treatment Summary:FRAC W/ 104,000 GAL K-1 EMUL., 40,000# 100 M, 100,000# 20/40 M, & 156,000# 10/20 M
Tubing Size:2.375 in.Tubing Setting Depth:4880 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/3/1980Test Method:PUMPING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 3
BBLS_OIL 30
CALC_GOR 3333
CASING_PRESS 65
MCF_GAS 100
TUBING_PRESS 65
Perforation Data:
Interval Top:4875 ft.# Of Holes:27
Interval Bottom:4901 ft.Hole Size:
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
10/2024 - 09/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)1
Total Gas Produced (MCF)1
GOR1000
GOR DeterminationBOE
Average BOE per Day0.003
Average MCFE per Day0.019

 Federal Financial Assurance  i 

 Tribal Well  i No