| Engineer | Form: (02) 2587291 07/21/2011 | 1) Provide 48 hour notice of MIRU to Jim Precup at 303-726-3822 or e-mail at jim.precup@state.co.us.
2) Note that it was assumed that the stage tool identified on this APD was proposed as the COGCC has no record of that being installed, per the submitted Completion Report and CBL on file. Both of which were submitted in August of 1995.
3) Note the stage tool setting depth changes. Place remedial cement to comply with Rule 317.i, set stage cement from 730’ to at least 50’ above the existing surface casing shoe and from 200’ below Sussex to 200’ above Sussex. Supply the cement volume necessary to provide this required coverage.
4) Within 30 days after recomplete, submit a Form 5 with CBL to document remedial cement in accordance with Rule 308A (change of wellbore configuration) and a Form 5A to document new status of both formations in accordance with Rule 308B.
|
| Permit | Form: (06) 400946842 12/28/2015 | Production records need to be corrected prior to the approval of the Subsequent Report of Abandonment (Form 6). (Incorrect reports for the J Sand formation from 10/18/11 thru present If J Sand was TA'd then only thru 1/2012. And Incorrect reports for the NB-CD from 11/2012 thru present.) |
| Engineer | Form: (06) 400946842 01/15/2016 | Note changes to plugging procedure:
1) Provide 48 hour notice of plugging MIRU via electronic Form 42.
2) For 950’ plug: pump plug and displace. If surface casing plug is not circulated to surface then tag plug – must be 107’ or shallower and provide 10 sx plug at the surface. Leave at least 100’ of cement in the casing for each plug.
3) Properly abandon flowlines as per Rule 1103. File electronic Form 42 once abandonment complete.
|