|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 3/1/2016 Measured TD: 7840 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 3/1/2016 | | Wellbore Permit | | | Permit #: | | Expiration Date: | 8/13/2013 | | Proposed Depth/Form: | 7840 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-66 , Unit Acreage: 160, Drill Unit: NE4 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 0 , Unit Acreage: 320, Drill Unit: N2 | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 407-87 , Unit Acreage: 160, Drill Unit: NE/4 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 213 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 225, Top: 0 ft., Bottom: 213 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7836 ft., Weight: 10.5 , Citings Type: PLANNED | | Cement: | Sacks: 200, Top: 7050 ft., Bottom: 7836 ft. | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 730 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 250, Top: 163 ft., Bottom: 730 ft. |
| | |
| Wellbore Completed | | Completion Date: | 6/4/1975 | | Spud Date: | 5/22/1975 | Spud Date Is: | ACTUAL | | Measured TD: | 7840 ft. | Measured PB depth: | 7801 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | cbl (10/18/11) CBL (11/28/12) CBL (12/14/12) | | Log Types: | SP-IES & FDC-GR CALIPER | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 207 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 225, Top: 0 ft., Bottom: 207 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7836 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 250, Top: 7050 ft., Bottom: 7836 ft., Determination Method: CBL | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 689 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: 130 ft., Bottom: 691 ft., Determination Method: CBL | | Additional Cement: | String Type: 1ST , Top: 6080 ft., Depth: 7011 ft., Bottom: 7011 ft., Sacks: 170, Method: SQUEEZE | | Additional Cement: | String Type: 1ST , Top: 4270 ft., Depth: 4810 ft., Bottom: 4810 ft., Sacks: 320, Method: SQUEEZE | | Additional Cement: | String Type: 1ST , Top: 800 ft., Depth: 851 ft., Bottom: 890 ft., Sacks: 125, Method: SQUEEZE | | Additional Cement: | String Type: 1ST , Top: 715 ft., Depth: 716 ft., Bottom: 716 ft., Sacks: 25, Method: SQUEEZE | | Additional Cement: | String Type: 1ST , Top: 800 ft., Depth: 851 ft., Bottom: 890 ft., Sacks: 25, Method: SQUEEZE | | Additional Cement: | String Type: 1ST , Top: 715 ft., Depth: 716 ft., Bottom: 716 ft., Sacks: 25, Method: SQUEEZE | | Additional Cement: | String Type: 1ST , Top: 4000 ft., Depth: 4271 ft., Bottom: 4271 ft., Sacks: 50, Method: SQUEEZE | | Additional Cement: | String Type: 1ST , Top: 4000 ft., Depth: 4271 ft., Bottom: 4271 ft., Sacks: 25, Method: SQUEEZE | | Additional Cement: | String Type: 1ST , Top: 800 ft., Depth: 851 ft., Bottom: 890 ft., Sacks: 25, Method: SQUEEZE | | Additional Cement: | String Type: 1ST , Top: 4560 ft., Depth: 4561 ft., Bottom: 4561 ft., Sacks: 120, Method: SQUEEZE | | Additional Cement: | String Type: 1ST , Top: 4300 ft., Depth: 4501 ft., Bottom: 4501 ft., Sacks: 100, Method: SQUEEZE | | Additional Cement: | String Type: 1ST , Top: 800 ft., Depth: 851 ft., Bottom: 890 ft., Sacks: 25, Method: SQUEEZE | | Additional Cement: | String Type: 1ST , Top: 850 ft., Depth: 851 ft., Bottom: 890 ft., Sacks: 25, Method: SQUEEZE | | Additional Cement: | String Type: 1ST , Top: 130 ft., Depth: 690 ft., Bottom: 734 ft., Sacks: 250, Method: DV TOOL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | FOX HILLS BASE | 430 ft. | | | | | NIOBRARA | 7070 ft. | | | | | CODELL | 7363 ft. | | | | | J SAND | 7688 ft. | | | |
Formation JSND Formation Classification: OW Status: AB - 3/1/2016 Interval Top: 7690 ft. Interval Bottom: 7740 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 10/18/2011 | | Treatment Summary: | SET BRIDGE PLUG @ 7210-7212. | | Formation Treatment | | Treatment Date: | 9/9/1975 | | Treatment Summary: | 305,088 GALS 79,800# 100 MESH SAND 403,200# 20/40 SAND 115,600# 10/20 SAND |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 8 | | BBLS_OIL | 17 | | CASING_PRESS | 450 | | GRAVITY_OIL | 60 | | MCF_GAS | 466 | | TUBING_PRESS | 250 |
| | Perforation Data: | | Interval Top: | 7690 ft. | # Of Holes: | 254 | | Interval Bottom: | 7740 ft. | Hole Size: | |
|
Formation CODL Formation Classification: OG Status: CM - 4/27/1999 Interval Top: 7235 ft. Interval Bottom: 7252 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 6/2/1995 | Choke Size: | | | Formation Name: | CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/18/2011 | | Treatment Summary: | SET BRIDGE PLUG @ 7210-7212. HOLE SIZE N/A | | Formation Treatment | | Treatment Date: | 9/9/1975 | | Treatment Summary: | PUMPED 429 BBLS OF POLYMER GEL AND 757 BBLS OF POLYMER GEL WITH 188,000 LBS OF 20/40 SAND. FLUSHED WITH 29 BBLS OF 2% KCL. PPA: 10.0 MAX PSI: 6500. MAX RATE: 17.1 BPM. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 62 | | BBLS_OIL | 70 | | CALC_GOR | 1100 | | CASING_PRESS | 1485 | | MCF_GAS | 77 | | TUBING_PRESS | 1485 |
| | Perforation Data: | | Interval Top: | 7235 ft. | # Of Holes: | 68 | | Interval Bottom: | 7252 ft. | Hole Size: | 38 in. |
|
Formation J-CDL Formation Classification: GW Status: CM - 2/12/1998 Interval Top: 7235 ft. Interval Bottom: 7731 ft.| Completed Information for Formation J-CODELL | | 1st Production Date: | 7/24/1995 | Choke Size: | | | Formation Name: | J-CODELL | Commingled: | Yes | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 9/9/1975 | | Treatment Summary: | PUMPED 429 BBLS OF POLYMER GEL AND 757 BBLS OF POLYMER GEL WITH 188,000 LBS OF 20/40 SAND. FLUSHED WITH 29 BBLS OF 2% KCL. PPA: 10.0 MAX PSI: 6500. MAX RATE: 17.1 BPM |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 7/24/1995 | Test Method: | FLOWING | | Hours Tested: | 100 | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 40 | | BBLS_OIL | 96 | | CALC_BBLS_H2O | 10 | | CALC_BBLS_OIL | 24 | | CALC_GOR | 3208 | | CALC_MCF_GAS | 77 | | MCF_GAS | 308 |
| | Perforation Data: | | Interval Top: | 7235 ft. | # Of Holes: | | | Interval Bottom: | 7731 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: OW Status: AB - 3/1/2016 Interval Top: 7006 ft. Interval Bottom: 7252 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 4/17/2012 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 7006 ft. | # Of Holes: | 116 | | Interval Bottom: | 7252 ft. | Hole Size: | 0.38 in. |
|
Formation NBRR Formation Classification: OG Status: CM - 1/31/2012 Interval Top: 7006 ft. Interval Bottom: 7152 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 1/23/2012 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 1/5/2012 | | Treatment Summary: | Frac Niobrara B & C down 2-7/8" Tbg w/ Pkr ^ Nio w/ 226,926 gal Slickwater w/ 201,070# 40/70, 4,000# SB Excel. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 1/31/2012 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | SHALE | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 3 | | BTU_GAS | 1208 | | CALC_BBLS_OIL | 3 | | CALC_GOR | 15000 | | CALC_MCF_GAS | 45 | | CASING_PRESS | 942 | | GRAVITY_OIL | 54 | | MCF_GAS | 45 |
| | Perforation Data: | | Interval Top: | 7006 ft. | # Of Holes: | 48 | | Interval Bottom: | 7152 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 03/01/2016 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|