Engineer | Form: (04 ) 400575105 3/21/2014 | 1) Existing CBL shows adequate Niobrara coverage not present so provide remedial cement at least 200’ above Niobrara.
2) The additional cement referenced shall be placed as indicated and comply with Rule 317.i. The placed cement shall be verified with a CBL and documented with a Form 5 Drilling Completion Report. |