|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 8/1/2025 Measured TD: 8400 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 8/1/2025 | | Wellbore Permit | | | Permit #: | 19720749 | Expiration Date: | 1/13/1973 | | Proposed Depth/Form: | 8300 ft. | | Surface Mineral Owner Same: | Not available | | Mineral Owner: | FEE | Surface Owner: | Not available | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 0 , Unit Acreage: 320, Drill Unit: S2 |
| | |
| Wellbore Completed | | Completion Date: | N/A | | Spud Date: | 8/2/1972 | Spud Date Is: | ACTUAL | | Measured TD: | 8400 ft. | Measured PB depth: | 8360 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 428 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 225, Top: 0 ft., Bottom: 428 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8395 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 250, Top: 7657 ft., Bottom: 8395 ft., Determination Method: CBL | | Additional Cement: | String Type: 1ST , Top: 6810 ft., Depth: 7620 ft., Bottom: 7690 ft., Sacks: 200, Method: SQUEEZE | | Additional Cement: | String Type: 1ST , Top: 493 ft., Depth: 1030 ft., Bottom: 1405 ft., Sacks: , Method: SQUEEZE | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4896 ft. | | | | | NIOBRARA | 7348 ft. | | | | | CARLILE | 7812 ft. | | | | | GREENHORN | 7892 ft. | | | | | J SAND | 8233 ft. | | | |
Formation JSND Formation Classification: GW Status: PR - 8/1/2025 Interval Top: 8272 ft. Interval Bottom: 8288 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 9/2/1972 | Choke Size: | 0.000 in. | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 10/3/1972 | | Treatment Summary: | 6500 GAL PAD, 20# GEL KCL WTR. 12,000 GAL W/10,000# 20/40 40,000 GAL W/44,000# 10/20 4,000 GAL W/3000# (1000# GB & 2000 UCAR PAK) AT 50 BPM AT 4000 PSI ISIP 2150 |
| | Tubing Size: | 1.25 in. | Tubing Setting Depth: | 8254 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/3/1972 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | VENTED | |
| Test Type | Measure |
|---|
| BBLS_OIL | 3.6 | | CASING_PRESS | 1475 | | MCF_GAS | 2514 | | TUBING_PRESS | 1359 |
| | Perforation Data: | | Interval Top: | 8272 ft. | # Of Holes: | | | Interval Bottom: | 8288 ft. | Hole Size: | |
|
Formation CODL Formation Classification: GW Status: PR - 8/1/2025 Interval Top: 7814 ft. Interval Bottom: 7840 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 7/2/1992 | Choke Size: | 0.100 in. | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 10/3/1972 | | Treatment Summary: | 302,000# 20/40 SAND IN 88,000 GALLONS GEL |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 7/7/1992 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 10 | | BBLS_OIL | 30 | | CALC_GOR | 2666 | | MCF_GAS | 80 | | TUBING_PRESS | 380 |
| | Perforation Data: | | Interval Top: | 7814 ft. | # Of Holes: | | | Interval Bottom: | 7840 ft. | Hole Size: | |
|
Formation J-CDL Formation Classification: GW Status: CM - 5/1/1997 Interval Top: 7814 ft. Interval Bottom: 8288 ft.| Completed Information for Formation J-CODELL | | 1st Production Date: | 8/4/1992 | Choke Size: | | | Formation Name: | J-CODELL | Commingled: | Yes | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8267 ft. | | Tubing Packer Depth: | 7722 ft. | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 9/1/1992 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 8 | | CALC_GOR | 7500 | | CASING_PRESS | 550 | | MCF_GAS | 60 | | TUBING_PRESS | 550 |
| | Perforation Data: | | Interval Top: | 7814 ft. | # Of Holes: | | | Interval Bottom: | 8288 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 10/2024 - 09/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 346 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.160 |
| Average MCFE per Day | 0.937 |
| Federal Financial Assurance | i | |
|
|