Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-103-12573FEDERAL
RG 424-13-298
TEP ROCKY MOUNTAIN LLC
96850
PR
6/1/2025
SULPHUR CREEK
80090
RIO BLANCO  103
LOT 12 13 2S98W 6
315513View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
PermitForm: (02)
402988836
10/06/2022
Operator shall comply with Notice to Operators: Interim Reclamation Procedures for Delayed Operations (dated January 5, 2017).
EngineerForm: (02)
402988836
10/31/2022
1)Operator shall comply with the most current revision of the Northwest Colorado Notification Policy. See attached notice. 2)Operator shall provide cement coverage from the production casing shoe (4+1/2" SECOND STRING) to a minimum of 200' above all Mesa Verde Group (and Ohio Creek Formation, if present) oil, gas, and water-bearing sandstone and coalbed formations. Verify production casing cement coverage with cement bond log.
EngineerForm: (04)
404210923
07/29/2025
Operator shall continue to monitor pressures and report to ECMC through annual testing. If monitored well conditions meet reaction threshold ,or indicate a deficiency, a new bradenhead test and sundry must be filed.
EngineerForm: (04)
404210923
07/29/2025
Conduct a bradenhead test during October 2025 and submit a Form 17. Attach monthly monitoring data to the Form 17.
EngineerForm: (04)
404391617
12/18/2025
Operator shall continue to monitor pressure and report to ECMC through annual testing. If monitored well conditions meet action threshold or indicate a deficiency, a new bradenhead test and sundry must be filed.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
Drilling/Completion OperationsForm: (02 )
402988836
11/9/2022
Alternative Logging Program: One of the first wells drilled on this pad will be logged with an open-hole resistivity log with gamma-ray, from TD into the 9 5/8” casing shoe. All wells on the pad will have a cement bond log (CBL) with gamma-ray run on production casing (or on intermediate casing if production liner is run) into the surface casing. The Form 5, Completion Report, for each well on the pad will list all logs run and have those logs attached. The Form 5 for a well without open-hole logs will state “Alternative Logging Program - No open-hole logs were run” and will clearly identify the type of log and the well (by API#) in which open-hole logs were run.