Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-12573
Well Classification: GW Status: PR - 6/1/2025
Well Name/No:FEDERAL #RG 424-13-298
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC0003453
Facility Status:PRStatus Date6/1/2025
FacilityID:483216LocationID:315513
County:RIO BLANCO #103Location:LOT 12 13 2S98W 6
Field:SULPHUR CREEK - #80090Elevation:6667 ft.
Basin:PICEANCE BASIN  
Planned Location:936FSL  1091 FELLat/Long: 39.871757 / -108.338003Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.871757 / -108.338004Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 12/11/2024
End Date: 12/22/2024
Reported: 2/12/2025
Days to report: 52
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 2/1/2025             Measured TD: 11652 ft.    Vertical TD: 11277 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 2/1/2025
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:9/6/2025
Proposed Top PZ Location:Sec:13 Twp: 2 98 Footage: 718 FSL  1853 FWL
Bottom Hole Location:Sec:13 Twp: 2 98 Footage: 624 FSL  1552 FWL
Proposed Depth/Form:11853 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number:
Formation And Spacing:Code: ILES , Formation: ILES , Order: 1-229 , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 1-229 , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 80 ft., Weight: 78.67 , Citings Type: PLANNED
Cement:Sacks: 230, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 1364 ft., Weight: 54.5 , Citings Type: PLANNED
Cement:Sacks: 445, Top: 0 ft., Bottom: 1364 ft.
Casing:String Type: 1ST, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 3117 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 154, Top: 2117 ft., Bottom: 3117 ft.
Casing:String Type: 2ND, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 11853 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 992, Top: 6313 ft., Bottom: 11853 ft.

Wellbore Completed
Completion Date:3/29/2024
Spud Date:3/11/2024Spud Date Is:ACTUAL
Measured TD:11652 ft.Measured PB depth:11607 ft.
True Vertical TD:11277 ft.True Vertical PB depth:11232 ft.
Top PZ Location:Sec:13 Twp: 2 98Footage: 718 FSL  1853 FWL
Bottom Hole Location:Sec:13 Twp: 2 98Footage: 624 FSL  1552 FWL
Log Types:CBL, (RES in API 103-12569).
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 80 ft., Weight: 78.67 , Citings Type: ACTUAL
Cement:Sacks: 189, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 17.5 in., Size: 13.625 in., Top: 0 ft., Depth: 1372 ft., Weight: 54.5 , Citings Type: ACTUAL
Cement:Sacks: 461, Top: 0 ft., Bottom: 1372 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 12.25 in., Size: 9.375 in., Top: 0 ft., Depth: 3153 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 227, Top: 1589 ft., Bottom: 3153 ft., Determination Method: CALC
Casing:String Type: 2ND, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 11642 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1604, Top: 4752 ft., Bottom: 11652 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
GREEN RIVER889 ft.
WASATCH2618 ft.
OHIO CREEK6587 ft.
CAMEO9954 ft.
ILES10430 ft.
ROLLINS10430 ft.
COZZETTE10584 ft.
CORCORAN10859 ft.
SEGO11156 ft.

Formation WFCRCC                 Formation Classification:  GW                 Status:  PR - 1/29/2025                 Interval Top: 6598 ft.    Interval Bottom: 11562 ft.

 Completed Information for Formation WILLIAMS FORK-CAMEO-ROLLINS-COZZETTE-CORCORAN
1st Production Date:1/29/2025Choke Size: 
Formation Name:WILLIAMS FORK-CAMEO-ROLLINS-COZZETTE-CORCORANCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:12/11/2024Treatment End Date:12/22/2024
Treatment Summary:221,100 bbls of Slickwater; 2,429 gals of Biocide
Total fluid used in treatment (bbls):221100Max pressure during treatment (psi):7375
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:21
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.57
Recycled water used in treatment (bbls):221100Total flowback volume recovered (bbls):64430
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:11071 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/29/2025Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1179
CALC_MCF_GAS 5394
CASING_PRESS 2522
MCF_GAS 5394
TUBING_PRESS 2289
Perforation Data:
Interval Top:6598 ft.# Of Holes:504
Interval Bottom:11562 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)4368
Total Gas Produced (MCF)879724
GOR201402
GOR DeterminationMCFE
Average BOE per Day428.043
Average MCFE per Day2482.635

 Federal Financial Assurance  i 

 Tribal Well  i No