COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
PermitForm: (02 )
400432619
4/14/2014
Open hole resistivity and gamma logs shall be run to describe the stratigraphy of the entire well bore and to adequately verify the setting depth of surface casing and aquifer coverage. On a multi-well pad, these open hole logs are only required on one of the first wells drilled on the pad and the Drilling Completion Report - Form 5 for every well on the pad shall identify which well was logged.
EngineerForm: (02 )
400432619
4/18/2014
(1) COMPLIANCE WITH THE MOST CURRENT REVISION OF THE NORTHWEST COLORADO NOTIFICATION POLICY IS REQUIRED. SEE ATTACHED NOTICE. (2) CEMENT ON INTERMEDIATE CASING (8+5/8" FIRST STRING) AND PRODUCTION CASING (5+1/2" SECOND STRING) MUST PROVIDE ISOLATION OF ALL MESAVERDE GROUP AND WASATCH OIL, GAS, AND WATER-BEARING SANDSTONE AND COALBED FORMATIONS THAT ARE NOT OTHERWISE COVERED BY SURFACE CASING. VERIFY CEMENT COVERAGE WITH CEMENT BOND LOGS ON BOTH CASING STRINGS.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
WildlifeForm: (02 )
400432619
4/21/2014
1. Where drilling and completion activities must occur in mule deer critical winter range, conduct these activities outside the time period from December 1 through April 15th, unless an approval is granted by the BLM Authorized Officer. 2. Restrict work-over rig activities to between the hours of 10:00 a.m. and 3:00 p.m. from December 1 to April 15 when possible, to accommodate mule deer critical winter range, unless an approval is granted by the BLM Authorized Officer. 3. Concentrate post-development water truck delivery trips to between the hours of 10:00 a.m. and 3:00 p.m. from December 1 to April 15 when possible, to accommodate mule deer critical winter range. 4. Follow company guidelines to minimize wildlife mortality from vehicle collisions on roads.
Storm Water/Erosion ControlForm: (02 )
400432619
4/21/2014
A Master Stormwater Management Plan, as required by the CDPHE, is in place for the White River Dome field and includes the subject location. The Plan details BMPs related to storm water management and erosion control that will be implemented during construction and interim reclamation. A Post-Construction Stormwater Plan is in place and will be implemented after interim reclamation is complete.
Material Handling and Spill PreventionForm: (02 )
400432619
4/21/2014
Koch Exploration Company operates certain natural gas production wells in Rio Blanco County Colorado that are subject to SPCC planning requirements because they have oil storage capacity greater than 1,320 gallons (approx. 31 bbl). For those wells that meet or exceed the threshold storage quantities (referred to henceforth as the "SPCC wells") KEC is required to develop and implement an SPCC Plan. This field wide SPCC Plan has been developed for the KEC SPCC wells that together are referred to as the Rio Blanco County Well Sites, Colorado in response to the regulations listed above.
Drilling/Completion OperationsForm: (02 )
400432619
4/21/2014
Koch Exploration Company will comply with the most current revision of the Northwest Colorado Notification Policy.